Zürcher Nachrichten - US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal

EUR -
AED 4.255618
AFN 75.309998
ALL 92.358548
AMD 422.104822
ANG 2.073658
AOA 1062.444686
ARS 1736.920935
AUD 1.616843
AWG 2.085496
AZN 1.974235
BAM 1.94563
BBD 2.33402
BDT 142.854512
BGN 1.965425
BHD 0.436831
BIF 3466.5575
BMD 1.158609
BND 1.47282
BOB 13.58809
BRL 6.017355
BSD 1.158853
BTN 110.472498
BWP 15.527967
BYN 3.494992
BYR 22708.732283
BZD 2.330737
CAD 1.611683
CDF 2633.518199
CHF 0.937844
CLF 0.027407
CLP 1078.676828
CNY 7.793672
CNH 7.798949
COP 3720.315997
CRC 522.970872
CUC 1.158609
CUP 30.703133
CVE 110.651651
CZK 24.143674
DJF 205.90841
DKK 7.476971
DOP 68.068722
DZD 154.54919
EGP 57.696928
ERN 17.379132
ETB 185.961199
FJD 2.547554
FKP 0.854831
GBP 0.856009
GEL 3.016856
GGP 0.854831
GHS 12.970672
GIP 0.854831
GMD 85.737462
GNF 10172.585588
GTQ 8.845838
GYD 242.454748
HKD 9.086216
HNL 31.132268
HRK 7.537218
HTG 151.608828
HUF 365.25187
IDR 20573.879727
ILS 3.448256
IMP 0.854831
INR 110.571309
IQD 1518.356819
IRR 1592594.677879
ISK 140.643968
JEP 0.854831
JMD 183.689828
JOD 0.821499
JPY 185.464348
KES 149.970767
KGS 101.320784
KHR 4687.156258
KMF 492.409141
KPW 1042.748251
KRW 1596.065155
KWD 0.357918
KYD 0.96576
KZT 537.047413
LAK 25981.802519
LBP 103753.417546
LKR 380.046723
LRD 208.839676
LSL 18.526596
LTL 3.421071
LVL 0.700831
LYD 7.346021
MAD 10.762362
MDL 20.03644
MGA 5015.617853
MKD 61.200624
MMK 2432.762691
MNT 4168.372878
MOP 9.358164
MRU 46.472237
MUR 54.269674
MVR 17.91253
MWK 2011.345259
MXN 19.736326
MYR 4.664448
MZN 74.047125
NAD 18.526591
NGN 1554.366817
NIO 42.544551
NOK 10.862889
NPR 176.755599
NZD 1.959758
OMR 0.441521
PAB 1.158853
PEN 3.883082
PGK 5.123658
PHP 72.147003
PKR 321.572303
PLN 4.341713
PYG 6867.163647
QAR 4.223174
RON 5.259509
RSD 117.395089
RUB 99.813465
RWF 1701.996312
SAR 4.390852
SBD 9.269084
SCR 16.081921
SDG 696.907446
SEK 11.097561
SGD 1.476651
SHP 0.858374
SLE 28.530786
SLL 24295.446125
SOS 662.149166
SRD 43.726325
STD 23980.86273
STN 24.765263
SVC 10.139866
SYP 15064.231378
SZL 18.526582
THB 38.408309
TJS 10.71946
TMT 4.066717
TND 3.375071
TOP 2.789652
TRY 55.891714
TTD 7.864957
TWD 36.65688
TZS 3064.517976
UAH 51.634047
UGX 4369.199296
USD 1.158609
UYU 46.666471
UZS 13700.549328
VES 916.085443
VND 30222.310286
VUV 137.006296
WST 3.13732
XAF 652.554455
XAG 0.017451
XAU 0.00026
XCD 3.131199
XCG 2.088601
XDR 0.819197
XOF 652.297133
XPF 119.331742
YER 274.039987
ZAR 18.737613
ZMK 10428.873593
ZMW 21.93155
ZWL 373.071558
  • CMSD

    0.0000

    21.18

    0%

  • CMSC

    -0.0200

    21.29

    -0.09%

  • JRI

    -0.0500

    12.35

    -0.4%

  • BCC

    -0.0200

    78.75

    -0.03%

  • VOD

    0.1600

    16.04

    +1%

  • BCE

    0.0600

    23.46

    +0.26%

  • RYCEF

    -0.2500

    20.5

    -1.22%

  • RBGPF

    0.0800

    70.77

    +0.11%

  • RELX

    0.2400

    36.54

    +0.66%

  • RIO

    -1.4800

    103.3

    -1.43%

  • GSK

    0.5500

    50.82

    +1.08%

  • BP

    -0.1900

    42.15

    -0.45%

  • AZN

    -1.8200

    162.7

    -1.12%

  • NGG

    -0.0800

    79.35

    -0.1%

  • BTI

    -0.1500

    56.13

    -0.27%

US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal
US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal

US Accelerates Review for 30-Year Trans-Alaska Pipeline Renewal

The Bureau of Land Management shortened public consultation to 15 days for a proposed 30-year renewal of the Trans-Alaska Pipeline System right-of-way.

Text size:

The Trump administration is accelerating an environmental review that could authorize the 800-mile Trans-Alaska Pipeline System for another 30 years. The proposal covers the pipeline, pump stations, access roads, bridges and a fuel-gas line within the federal right-of-way.

The Bureau of Land Management reduced the public-comment period to 15 days. Federal consultations commonly last 30 to 60 days or longer depending on complexity. The right-of-way was not due for renewal until 2034, which would have been its third renewal since 1974.

BLM Alaska director Kevin Pendergast said the agency was acting early to secure the pipeline while the administration seeks to expand energy development in the National Petroleum Reserve in Alaska and the Arctic National Wildlife Refuge coastal plain. The agency’s Alaska office did not separately answer a request for comment.

The system has carried oil from the North Slope to the Valdez Marine Terminal since 1977. The source report stated that it had transported more than 19 million barrels over that period, while BLM said average daily throughput in 2025 was 463,000 barrels.

Public Employees for Environmental Responsibility said the early process appeared designed to avoid fuller consideration of economic and ecological concerns. Two owners, ConocoPhillips and ExxonMobil, each gave $1 million to Trump’s inaugural fund, federal records show. Harvest Alaska is also an owner.

The review follows Trump’s Jan. 20, 2025, executive order titled “Unleashing Alaska’s Extraordinary Resource Potential,” which directed agencies to increase fossil-fuel development on federal and state land and speed project permits. Congress approved construction of the pipeline on Nov. 16, 1973, shortly after the Arab oil embargo was announced.

Comments were due through the BLM planning website or by email by Sept. 10 at 10 p.m. Alaska time, 11 p.m. Pacific time, or Sept. 11 at 2 a.m. Eastern time.

Environmental and social concerns accompanied the project from its opening, including effects on caribou habitat, permafrost and tribal practices. In 1977, White House science adviser Frank Press warned President Jimmy Carter that rising carbon-dioxide levels could alter the climate. Press projected concentrations would reach 1.5 times the preindustrial level by 2037, but the 420-parts-per-million threshold arrived 14 years earlier.

Alaska is warming two to three times faster than the global average, according to federal data. Since 1971, average annual temperatures have increased by between 2.2 degrees Fahrenheit in central Southeast Alaska and 6 degrees on the North Slope. The changes are melting permafrost and reducing sea and river ice. Glaciers are now losing ice at twice the rate recorded from 1960 through 2004.

Cooper Freeman of the Center for Biological Diversity said oil carried by the pipeline has contributed to climate disruption affecting salmon, caribou and communities. He called for a thorough and public review rather than an expedited authorization extending operations for three decades.

W.F.Portman--NZN