Zürcher Nachrichten - Nepal rescuers advance towards trapped tunnel workers

EUR -
AED 4.135003
AFN 74.312152
ALL 91.998807
AMD 407.29472
ANG 2.015836
AOA 1032.483179
ARS 1713.371989
AUD 1.624961
AWG 2.029499
AZN 1.91856
BAM 1.955775
BBD 2.262771
BDT 138.128209
BGN 1.895446
BHD 0.423495
BIF 3389.456062
BMD 1.125935
BND 1.437881
BOB 13.498825
BRL 5.867029
BSD 1.123485
BTN 108.843589
BWP 15.531799
BYN 3.383956
BYR 22068.333923
BZD 2.259471
CAD 1.604402
CDF 2600.911191
CHF 0.932682
CLF 0.028256
CLP 1115.712356
CNY 7.548891
CNH 7.557396
COP 3725.451706
CRC 514.793327
CUC 1.125935
CUP 26.96265
CVE 110.263571
CZK 24.454533
DJF 200.057407
DKK 7.479143
DOP 67.07913
DZD 150.570048
EGP 58.776238
ERN 16.889031
ETB 183.500221
FJD 2.530259
FKP 0.851099
GBP 0.850212
GEL 2.933107
GGP 0.851099
GHS 13.194829
GIP 0.851099
GMD 82.760588
GNF 9882.871886
GTQ 8.585889
GYD 235.006954
HKD 8.83567
HNL 30.162609
HRK 7.540056
HTG 147.118093
HUF 368.676725
IDR 20141.295479
ILS 3.436727
IMP 0.851099
INR 108.456295
IQD 1471.780921
IRR 1966490.662268
ISK 137.285738
JEP 0.851099
JMD 177.857694
JOD 0.798333
JPY 177.718077
KES 145.82811
KGS 98.463484
KHR 4556.940927
KMF 493.160101
KPW 1013.342222
KRW 1512.345607
KWD 0.347723
KYD 0.936188
KZT 504.773457
LAK 25235.672864
LBP 100605.895823
LKR 371.535184
LRD 192.10751
LSL 18.784656
LTL 3.324595
LVL 0.681068
LYD 7.194907
MAD 11.161855
MDL 20.07674
MGA 4963.935651
MKD 61.574202
MMK 2363.962729
MNT 4050.351228
MOP 9.080782
MRU 44.894418
MUR 54.214216
MVR 17.407387
MWK 1948.074747
MXN 20.447892
MYR 4.599338
MZN 71.951471
NAD 18.784656
NGN 1498.384001
NIO 41.339464
NOK 10.829927
NPR 174.149742
NZD 2.004693
OMR 0.432034
PAB 1.123485
PEN 3.89325
PGK 5.087934
PHP 70.464983
PKR 311.170466
PLN 4.386363
PYG 6572.914794
QAR 4.095147
RON 5.339077
RSD 117.478477
RUB 94.165779
RWF 1663.878431
SAR 4.214702
SBD 9.095387
SCR 15.468899
SDG 677.254284
SEK 11.304508
SGD 1.439625
SHP 0.850115
SLE 27.702139
SLL 23610.293318
SOS 642.091676
SRD 42.573311
STD 23304.589613
STN 24.499682
SVC 9.829873
SYP 14639.412412
SZL 18.780757
THB 37.722942
TJS 10.341466
TMT 3.940774
TND 3.347757
TOP 2.710982
TRY 55.314396
TTD 7.617901
TWD 35.829296
TZS 2960.361624
UAH 50.551445
UGX 4482.941887
USD 1.125935
UYU 45.279413
UZS 13250.828227
VES 974.472491
VND 29257.994447
VUV 134.924899
WST 3.139874
XAF 655.957
XAG 0.018651
XAU 0.000271910232
XCD 3.042897
XCG 2.024774
XDR 0.796095
XOF 655.957
XPF 119.331742
YER 266.062577
ZAR 18.752511
ZMK 10134.773796
ZMW 22.075714
ZWL 362.550741
SSP 6432.009114
MXV 2.313642
  • AZN

    -0.8000

    156.9

    -0.51%

  • RBGPF

    0.0900

    65.09

    +0.14%

  • BCE

    -0.1900

    19.73

    -0.96%

  • RYCEF

    0.1200

    19.42

    +0.62%

  • NGG

    0.7900

    76.12

    +1.04%

  • BTI

    0.2849

    52.64

    +0.54%

  • CMSC

    0.0800

    20.24

    +0.4%

  • RELX

    -0.0700

    33.42

    -0.21%

  • GSK

    -0.1500

    47.03

    -0.32%

  • RIO

    1.3400

    94.21

    +1.42%

  • BCC

    0.2900

    74.99

    +0.39%

  • BP

    0.2900

    44.79

    +0.65%

  • VOD

    0.4400

    16.82

    +2.62%

  • JRI

    0.1300

    10.9

    +1.19%

  • CMSD

    0.0900

    20.43

    +0.44%

Nepal rescuers advance towards trapped tunnel workers
Nepal rescuers advance towards trapped tunnel workers / Photo: Arun SANKAR - AFP

Nepal rescuers advance towards trapped tunnel workers

Nepali rescuers drilled, dug and used explosives on Sunday in a bid to reach dozens of hydropower workers believed trapped in tunnels swamped by flood debris, racing against time to find survivors.

Text size:

Rescue operations entered their fifth day since the floods hit the Nepal-China border. Teams battled rain, rising rivers and treacherous conditions at the disaster sites.

Nepal's government says more than 100 workers may still be trapped alive inside multiple tunnels at hydropower projects, with key rescue efforts focused on the Trishuli 3A and 3B sites in a Himalayan valley.

"Efforts to rescue people trapped inside the tunnel of the Upper Trishuli 3A Hydropower Project in Nuwakot have been intensified, including attempts by engineers from the Nepali Army to carry out blasting operations," Nepal's energy ministry said on Sunday.

They are among 933 hydropower workers missing since a wall of mud and debris swept down on Wednesday morning, according to the National Disaster Risk Reduction and Management Authority.

The team, comprising around 90 army and police personnel, first broke through into the upper part of a mud-swamped 3A tunnel on Saturday night, pumping air inside and sending in a camera.

Using heavy equipment including "drilling machines, excavators, hydraulic cutters, and other equipment" on Sunday, they drilled four holes before rescuers descended by rope into the crater.

"After descending through the opening using ropes and calling out to those inside, no response was received," the prime minister's office said in a statement.

"To make the rescue operation easier and faster, the teams are simultaneously using heavy equipment, carrying out blasting, and widening the opening."

Photographs shared by the disaster office showed workers wading through churned mud and navigating vast boulders left by the floods.

Work continues to "clear the entrance", the energy ministry said, which it said is approximately 180 metres (590 feet) from the "working space".

"... preparations are being made to send rescuers equipped with oxygen into the tunnel," once the opening is cleared, the energy ministry said.

"A camera will also be sent in with the rescuers, allowing the actual conditions inside the tunnel to be monitored from outside," it said.

"Once the working space is reached, more clear information will be available about the actual condition, location, and safety status of the people trapped inside."

- 'Submerged with slush' -

The US Geological Survey said the disaster was caused by a glacial collapse.

Specialised Indian, Chinese and South Korean tunnel-rescue teams have also joined the efforts.

Nepal's expert mountain rescue teams -- who regularly aid climbers on the world's highest peaks, including Everest -- are also joining the search for missing people at another damaged hydropower site.

Flood survivors from other hydropower sites described a terrifying rush of water that had engulfed them within minutes.

Hydropower worker Surendra Dowluri, 33, from India's Andhra Pradesh state, described how raging water swamped the Upper Trishuli-1 site, where he was working.

"We heard a very loud sound... and saw that the turbine floor was submerged with slush, and six workers were stuck in that," Dowluri told AFP in Kathmandu on Sunday after being rescued the day before.

"We managed to rescue five of them, but one person lost his life," he said, describing how some workers reached higher ground or construction areas out of reach of the torrent.

That represents about 10 percent of Nepal's installed electricity generation capacity, according to the authority.

Another 15 power projects under construction, with a combined planned capacity of 470 megawatts, have also been damaged.

P.Gashi--NZN