Zürcher Nachrichten - Bad day in space: Moon mission fails and NASA program delayed

EUR -
AED 4.240257
AFN 73.32143
ALL 96.053795
AMD 433.817139
ANG 2.066822
AOA 1058.764604
ARS 1599.696819
AUD 1.675026
AWG 2.078272
AZN 1.967396
BAM 1.955877
BBD 2.317892
BDT 141.205579
BGN 1.973561
BHD 0.434817
BIF 3418.53506
BMD 1.154596
BND 1.481959
BOB 7.981315
BRL 6.067751
BSD 1.150845
BTN 109.078309
BWP 15.865627
BYN 3.425635
BYR 22630.074075
BZD 2.314491
CAD 1.604715
CDF 2635.36902
CHF 0.917923
CLF 0.027055
CLP 1068.301597
CNY 7.980392
CNH 7.989998
COP 4229.267091
CRC 534.421114
CUC 1.154596
CUP 30.596784
CVE 110.269357
CZK 24.603629
DJF 204.928096
DKK 7.496448
DOP 68.502706
DZD 153.573067
EGP 60.780401
ERN 17.318934
ETB 177.904429
FJD 2.606389
FKP 0.868614
GBP 0.866456
GEL 3.094767
GGP 0.868614
GHS 12.609498
GIP 0.868614
GMD 84.867224
GNF 10090.398654
GTQ 8.807348
GYD 240.899518
HKD 9.036039
HNL 30.555207
HRK 7.557064
HTG 150.85596
HUF 390.276858
IDR 19617.503194
ILS 3.622683
IMP 0.868614
INR 109.435464
IQD 1507.559561
IRR 1516272.693223
ISK 144.047794
JEP 0.868614
JMD 181.147157
JOD 0.818654
JPY 185.066713
KES 149.485906
KGS 100.96983
KHR 4609.182101
KMF 494.167328
KPW 1039.005581
KRW 1741.604016
KWD 0.355512
KYD 0.959038
KZT 556.361981
LAK 25029.988892
LBP 103054.87152
LKR 362.514322
LRD 211.168343
LSL 19.761581
LTL 3.409221
LVL 0.698404
LYD 7.34629
MAD 10.755925
MDL 20.213799
MGA 4796.189489
MKD 61.642435
MMK 2427.526343
MNT 4123.646826
MOP 9.285467
MRU 45.949815
MUR 54.000874
MVR 17.838939
MWK 1995.478838
MXN 20.923702
MYR 4.530678
MZN 73.836825
NAD 19.761581
NGN 1597.337286
NIO 42.351673
NOK 11.20288
NPR 174.524895
NZD 2.015881
OMR 0.443458
PAB 1.150845
PEN 4.008858
PGK 4.973196
PHP 69.911197
PKR 321.19049
PLN 4.298271
PYG 7524.297272
QAR 4.195866
RON 5.111746
RSD 117.404638
RUB 93.863708
RWF 1680.566396
SAR 4.33291
SBD 9.285301
SCR 17.363686
SDG 693.912357
SEK 10.938258
SGD 1.49255
SHP 0.866246
SLE 28.345751
SLL 24211.30527
SOS 657.725986
SRD 43.413994
STD 23897.798134
STN 24.500968
SVC 10.069398
SYP 129.111885
SZL 19.759781
THB 37.518628
TJS 10.995934
TMT 4.041085
TND 3.392934
TOP 2.779989
TRY 51.310654
TTD 7.819309
TWD 36.998328
TZS 2969.117305
UAH 50.443693
UGX 4287.169379
USD 1.154596
UYU 46.58184
UZS 14034.554481
VES 540.268027
VND 30409.162038
VUV 138.27014
WST 3.204592
XAF 655.982917
XAG 0.0165
XAU 0.000256
XCD 3.120353
XCG 2.074082
XDR 0.815832
XOF 655.982917
XPF 119.331742
YER 275.490657
ZAR 19.766689
ZMK 10392.750198
ZMW 21.663856
ZWL 371.779317
  • RBGPF

    -13.5000

    69

    -19.57%

  • GSK

    -0.1000

    53.84

    -0.19%

  • BCC

    0.1400

    74.43

    +0.19%

  • CMSD

    -0.0900

    22.66

    -0.4%

  • NGG

    -0.4800

    81.92

    -0.59%

  • BCE

    -0.2200

    25.25

    -0.87%

  • RIO

    0.8500

    86.64

    +0.98%

  • RYCEF

    -0.5900

    14.65

    -4.03%

  • AZN

    5.0200

    188.42

    +2.66%

  • RELX

    -0.1000

    31.97

    -0.31%

  • CMSC

    -0.0500

    22.77

    -0.22%

  • JRI

    -0.2700

    11.8

    -2.29%

  • BTI

    0.3749

    57.8

    +0.65%

  • VOD

    -0.1400

    14.49

    -0.97%

  • BP

    0.5100

    46.68

    +1.09%

Bad day in space: Moon mission fails and NASA program delayed

Bad day in space: Moon mission fails and NASA program delayed

A private US lunar lander mission is doomed to fail, and NASA pushes back plans to return astronauts to the Moon.

Text size:

The twin developments Tuesday represent blows to America's ambitions to stimulate a commercial space economy, develop a lasting presence on Earth's nearest neighbor, and use it as a jump off point for Mars.

China meanwhile is looming in the rear view mirror, targeting 2030 for a crewed landing.

Astrobotic's Peregrine Lunar Lander blasted off Monday from Florida's Cape Canaveral Space Force Station, then successfully separated from its rocket.

Just hours later, though, Astrobotic reported an inability to orient Peregrine's solar panel towards the Sun and keep its battery topped up. A propulsion system glitch was found to be causing a critical loss of fuel and damaging the spacecraft's exterior.

The company said Monday the mission had "no chance of soft landing" -- dashing hopes for the first ever successful landing by a non-government mission, and America's first soft touchdown on the Moon since Apollo 17 in 1972.

NASA has paid Astrobotic more than $100 million to ship scientific hardware to the Moon to answer questions about surface composition and radiation, as the US space agency prepares to send astronauts back for long term missions.

The failure doesn't mean the strategy of ramping up commercial partnerships is innately flawed, Michael Lembeck, a former NASA official turned associate professor in aerospace engineering at the University of Illinois told AFP.

"It's a balance of making progress versus accepting risk -- and I think in the long term these failures are just as informative success," he said, adding NASA's contracts with other companies, including Houston-based Intuitive Machines, which will attempt to launch a lander next month, helped spread such risks.

- Artemis safety issues -

But, further spoiling the mood for space watchers, NASA Administrator Bill Nelson announced the agency was pushing back its planned return of astronauts to the lunar surface from December 2025 to September 2026, citing safety issues with the Orion crew capsule.

And few analysts believe the new date for American boots on the Moon is credible.

In a briefing Tuesday, NASA officials went into new detail about concerns linked to the Orion capsule built by Lockheed Martin.

First, the uncrewed Artemis 1 mission revealed the heat shield lost some of its material during its fiery reentry to the atmosphere.

Second, a design flaw has been uncovered during new testing in Orion's ability to open and shut valves connected to the life support system -- described by Amit Kshatriya, deputy associate administrator for the Moon to Mars program -- as "unacceptable."

Third, when engineers put the vehicle under stress testing to simulate an emergency ejection from the Space Launch Systems (SLS) rocket, they found a battery became disconnected, meaning Orion might not be able to maintain power as it floats back to the ground.

- SpaceX complications -

While it's back to the drawing board for Orion, its issues are dwarfed by the fact that the Artemis 3 lander, a modified version of SpaceX's next-gen Starship rocket, is nowhere near ready, having exploded in its two orbital test flights to date.

Even once Starship stops blowing up, SpaceX will have to succeed in its own uncrewed lunar landing ahead of Artemis 3.

Its complex plans involve launching a spaceship to serve as a fuel depot, having 10 more Starships launch and fuel up the depot, then having yet another Starship collect that fuel and journey to the Moon, where it would dock with an Orion capsule and fly down to the surface.

Given these constraints, the new deadline is far from realistic, said Lembeck, stressing that compared to the Apollo years, NASA is working to a much tighter budget, in a more risk-averse era, without a national imperative to beat the Soviet Union.

M.Hug--NZN