Zürcher Nachrichten - Bad day in space: Moon mission fails and NASA program delayed

EUR -
AED 4.175728
AFN 73.328437
ALL 92.12319
AMD 413.073921
ANG 2.035429
AOA 1043.654828
ARS 1733.645151
AUD 1.619717
AWG 2.047804
AZN 1.929658
BAM 1.955205
BBD 2.290054
BDT 139.988644
BGN 1.913869
BHD 0.428546
BIF 3410.637413
BMD 1.136879
BND 1.453322
BOB 13.921948
BRL 5.940079
BSD 1.137029
BTN 109.070258
BWP 15.545476
BYN 3.441704
BYR 22282.831098
BZD 2.286635
CAD 1.611242
CDF 2643.243691
CHF 0.945292
CLF 0.027864
CLP 1100.237215
CNY 7.628971
CNH 7.629846
COP 3833.658771
CRC 516.376973
CUC 1.136879
CUP 27.287899
CVE 110.615584
CZK 24.397762
DJF 202.045914
DKK 7.476079
DOP 63.523102
DZD 152.155133
EGP 59.224244
ERN 17.053187
ETB 185.279579
FJD 2.543426
FKP 0.858135
GBP 0.857639
GEL 2.972931
GGP 0.858135
GHS 13.250277
GIP 0.858135
GMD 84.129164
GNF 9951.102741
GTQ 8.683435
GYD 237.900764
HKD 8.919101
HNL 30.520983
HRK 7.532055
HTG 148.801276
HUF 367.143218
IDR 20468.826746
ILS 3.501135
IMP 0.858135
INR 109.123401
IQD 1489.360006
IRR 1563038.2821
ISK 136.971423
JEP 0.858135
JMD 179.985245
JOD 0.806063
JPY 178.950458
KES 147.430914
KGS 99.418378
KHR 4614.657011
KMF 492.268388
KPW 1023.191585
KRW 1546.292209
KWD 0.351091
KYD 0.947524
KZT 499.99229
LAK 25510.575738
LBP 101814.469258
LKR 376.332132
LRD 195.553089
LSL 18.68358
LTL 3.356908
LVL 0.687686
LYD 7.272915
MAD 10.948962
MDL 20.10115
MGA 4987.54849
MKD 61.551275
MMK 2387.259195
MNT 4088.298238
MOP 9.186926
MRU 45.546544
MUR 53.967978
MVR 17.564927
MWK 1971.526233
MXN 20.450757
MYR 4.640284
MZN 72.657494
NAD 18.68358
NGN 1505.819136
NIO 41.83764
NOK 10.842985
NPR 174.517583
NZD 2.006494
OMR 0.437134
PAB 1.136969
PEN 3.863495
PGK 5.143526
PHP 71.042411
PKR 315.023605
PLN 4.369538
PYG 6677.968423
QAR 4.144239
RON 5.276139
RSD 117.410088
RUB 96.042466
RWF 1678.71145
SAR 4.27002
SBD 9.168529
SCR 15.90461
SDG 683.84998
SEK 11.322464
SGD 1.452594
SHP 0.858346
SLE 28.023601
SLL 23839.777847
SOS 649.845174
SRD 42.8444
STD 23531.1028
STN 24.494164
SVC 9.948061
SYP 14781.702837
SZL 18.678893
THB 38.129142
TJS 10.488448
TMT 3.990446
TND 3.366876
TOP 2.737332
TRY 55.698665
TTD 7.716856
TWD 36.144685
TZS 2995.679938
UAH 51.019579
UGX 4450.724294
USD 1.136879
UYU 45.576936
UZS 13433.149672
VES 969.111532
VND 29529.867161
VUV 133.925611
WST 3.121549
XAF 655.957
XAG 0.018746
XAU 0.000276277497
XCD 3.072473
XCG 2.049095
XDR 0.803833
XOF 655.957
XPF 119.331742
YER 269.042434
ZAR 18.643117
ZMK 10233.283289
ZMW 22.142556
ZWL 366.074618
SSP 6494.52655
MXV 2.315995
  • RBGPF

    -1.5200

    64.47

    -2.36%

  • BCE

    -0.4100

    20.56

    -1.99%

  • RYCEF

    -0.0400

    19.56

    -0.2%

  • NGG

    -0.2500

    75.24

    -0.33%

  • GSK

    0.4600

    49.7

    +0.93%

  • BCC

    -0.5500

    76.59

    -0.72%

  • VOD

    -0.0400

    16.58

    -0.24%

  • RIO

    -0.1500

    94.41

    -0.16%

  • CMSC

    0.0000

    20.4

    0%

  • RELX

    -0.4500

    33.07

    -1.36%

  • JRI

    -0.2500

    10.77

    -2.32%

  • CMSD

    -0.0300

    20.27

    -0.15%

  • BTI

    0.4200

    56.05

    +0.75%

  • BP

    0.2800

    44.43

    +0.63%

  • AZN

    -0.4300

    166.15

    -0.26%

Bad day in space: Moon mission fails and NASA program delayed

Bad day in space: Moon mission fails and NASA program delayed

A private US lunar lander mission is doomed to fail, and NASA pushes back plans to return astronauts to the Moon.

Text size:

The twin developments Tuesday represent blows to America's ambitions to stimulate a commercial space economy, develop a lasting presence on Earth's nearest neighbor, and use it as a jump off point for Mars.

China meanwhile is looming in the rear view mirror, targeting 2030 for a crewed landing.

Astrobotic's Peregrine Lunar Lander blasted off Monday from Florida's Cape Canaveral Space Force Station, then successfully separated from its rocket.

Just hours later, though, Astrobotic reported an inability to orient Peregrine's solar panel towards the Sun and keep its battery topped up. A propulsion system glitch was found to be causing a critical loss of fuel and damaging the spacecraft's exterior.

The company said Monday the mission had "no chance of soft landing" -- dashing hopes for the first ever successful landing by a non-government mission, and America's first soft touchdown on the Moon since Apollo 17 in 1972.

NASA has paid Astrobotic more than $100 million to ship scientific hardware to the Moon to answer questions about surface composition and radiation, as the US space agency prepares to send astronauts back for long term missions.

The failure doesn't mean the strategy of ramping up commercial partnerships is innately flawed, Michael Lembeck, a former NASA official turned associate professor in aerospace engineering at the University of Illinois told AFP.

"It's a balance of making progress versus accepting risk -- and I think in the long term these failures are just as informative success," he said, adding NASA's contracts with other companies, including Houston-based Intuitive Machines, which will attempt to launch a lander next month, helped spread such risks.

- Artemis safety issues -

But, further spoiling the mood for space watchers, NASA Administrator Bill Nelson announced the agency was pushing back its planned return of astronauts to the lunar surface from December 2025 to September 2026, citing safety issues with the Orion crew capsule.

And few analysts believe the new date for American boots on the Moon is credible.

In a briefing Tuesday, NASA officials went into new detail about concerns linked to the Orion capsule built by Lockheed Martin.

First, the uncrewed Artemis 1 mission revealed the heat shield lost some of its material during its fiery reentry to the atmosphere.

Second, a design flaw has been uncovered during new testing in Orion's ability to open and shut valves connected to the life support system -- described by Amit Kshatriya, deputy associate administrator for the Moon to Mars program -- as "unacceptable."

Third, when engineers put the vehicle under stress testing to simulate an emergency ejection from the Space Launch Systems (SLS) rocket, they found a battery became disconnected, meaning Orion might not be able to maintain power as it floats back to the ground.

- SpaceX complications -

While it's back to the drawing board for Orion, its issues are dwarfed by the fact that the Artemis 3 lander, a modified version of SpaceX's next-gen Starship rocket, is nowhere near ready, having exploded in its two orbital test flights to date.

Even once Starship stops blowing up, SpaceX will have to succeed in its own uncrewed lunar landing ahead of Artemis 3.

Its complex plans involve launching a spaceship to serve as a fuel depot, having 10 more Starships launch and fuel up the depot, then having yet another Starship collect that fuel and journey to the Moon, where it would dock with an Orion capsule and fly down to the surface.

Given these constraints, the new deadline is far from realistic, said Lembeck, stressing that compared to the Apollo years, NASA is working to a much tighter budget, in a more risk-averse era, without a national imperative to beat the Soviet Union.

M.Hug--NZN