Zürcher Nachrichten - Bad day in space: Moon mission fails and NASA program delayed

EUR -
AED 4.312666
AFN 77.504793
ALL 97.092648
AMD 448.399986
ANG 2.102088
AOA 1076.847291
ARS 1686.896325
AUD 1.761496
AWG 2.116703
AZN 2.000467
BAM 1.960349
BBD 2.364667
BDT 143.471704
BGN 1.956294
BHD 0.442706
BIF 3483.018266
BMD 1.174315
BND 1.518611
BOB 8.112757
BRL 6.348108
BSD 1.174014
BTN 105.972005
BWP 16.572315
BYN 3.444664
BYR 23016.573841
BZD 2.361259
CAD 1.61739
CDF 2624.594513
CHF 0.932922
CLF 0.027367
CLP 1073.617798
CNY 8.288374
CNH 8.27993
COP 4466.213493
CRC 584.651703
CUC 1.174315
CUP 31.119347
CVE 110.728071
CZK 24.211317
DJF 208.699796
DKK 7.468884
DOP 75.392864
DZD 152.301647
EGP 55.826109
ERN 17.614725
ETB 183.134804
FJD 2.667801
FKP 0.88041
GBP 0.87674
GEL 3.173602
GGP 0.88041
GHS 13.502195
GIP 0.88041
GMD 85.725448
GNF 10204.797655
GTQ 8.991789
GYD 245.587794
HKD 9.138461
HNL 30.826099
HRK 7.536637
HTG 153.755479
HUF 383.003453
IDR 19558.862063
ILS 3.769574
IMP 0.88041
INR 105.983513
IQD 1538.352639
IRR 49450.40402
ISK 148.200057
JEP 0.88041
JMD 188.098082
JOD 0.832583
JPY 182.674078
KES 151.370792
KGS 102.693345
KHR 4703.131575
KMF 493.212034
KPW 1056.917742
KRW 1728.063547
KWD 0.360068
KYD 0.978362
KZT 611.323367
LAK 25459.149534
LBP 105159.907704
LKR 363.069409
LRD 207.972124
LSL 19.928047
LTL 3.467447
LVL 0.710332
LYD 6.370632
MAD 10.774319
MDL 19.994226
MGA 5290.289272
MKD 61.555786
MMK 2465.964261
MNT 4164.959879
MOP 9.410056
MRU 46.702398
MUR 54.100312
MVR 18.095963
MWK 2039.784988
MXN 21.174541
MYR 4.817623
MZN 75.040766
NAD 19.928443
NGN 1705.868727
NIO 43.155975
NOK 11.816774
NPR 169.555008
NZD 2.020656
OMR 0.451528
PAB 1.174014
PEN 3.958027
PGK 4.9835
PHP 69.06135
PKR 329.034639
PLN 4.226001
PYG 8023.550282
QAR 4.27571
RON 5.09124
RSD 117.382167
RUB 94.223596
RWF 1705.105368
SAR 4.406801
SBD 9.665308
SCR 16.42028
SDG 706.366623
SEK 10.861298
SGD 1.516587
SHP 0.88104
SLE 28.299773
SLL 24624.796038
SOS 671.118193
SRD 45.313876
STD 24305.9494
STN 24.965937
SVC 10.273057
SYP 12984.228527
SZL 19.927722
THB 37.143739
TJS 10.824626
TMT 4.110102
TND 3.443678
TOP 2.827469
TRY 50.056797
TTD 7.967421
TWD 36.630291
TZS 2881.461287
UAH 49.557442
UGX 4174.651708
USD 1.174315
UYU 46.228059
UZS 14150.495768
VES 310.882121
VND 30916.777949
VUV 143.84552
WST 3.264711
XAF 657.477073
XAG 0.018579
XAU 0.000275
XCD 3.173645
XCG 2.115892
XDR 0.818434
XOF 658.199978
XPF 119.331742
YER 279.927339
ZAR 19.806934
ZMK 10570.241854
ZMW 26.915227
ZWL 378.128948
  • SCS

    0.0200

    16.14

    +0.12%

  • JRI

    0.0000

    13.72

    0%

  • NGG

    0.0500

    74.69

    +0.07%

  • CMSC

    0.1300

    23.43

    +0.55%

  • BCC

    -0.7500

    76.26

    -0.98%

  • RIO

    0.5000

    76.74

    +0.65%

  • GSK

    0.4700

    48.88

    +0.96%

  • BP

    -0.3500

    35.53

    -0.99%

  • RBGPF

    3.1200

    81.17

    +3.84%

  • BCE

    0.2100

    23.4

    +0.9%

  • BTI

    -0.3900

    58.37

    -0.67%

  • AZN

    -1.2200

    90.29

    -1.35%

  • CMSD

    0.1200

    23.4

    +0.51%

  • RYCEF

    0.2300

    14.85

    +1.55%

  • VOD

    -0.0200

    12.54

    -0.16%

  • RELX

    0.2000

    40.28

    +0.5%

Bad day in space: Moon mission fails and NASA program delayed

Bad day in space: Moon mission fails and NASA program delayed

A private US lunar lander mission is doomed to fail, and NASA pushes back plans to return astronauts to the Moon.

Text size:

The twin developments Tuesday represent blows to America's ambitions to stimulate a commercial space economy, develop a lasting presence on Earth's nearest neighbor, and use it as a jump off point for Mars.

China meanwhile is looming in the rear view mirror, targeting 2030 for a crewed landing.

Astrobotic's Peregrine Lunar Lander blasted off Monday from Florida's Cape Canaveral Space Force Station, then successfully separated from its rocket.

Just hours later, though, Astrobotic reported an inability to orient Peregrine's solar panel towards the Sun and keep its battery topped up. A propulsion system glitch was found to be causing a critical loss of fuel and damaging the spacecraft's exterior.

The company said Monday the mission had "no chance of soft landing" -- dashing hopes for the first ever successful landing by a non-government mission, and America's first soft touchdown on the Moon since Apollo 17 in 1972.

NASA has paid Astrobotic more than $100 million to ship scientific hardware to the Moon to answer questions about surface composition and radiation, as the US space agency prepares to send astronauts back for long term missions.

The failure doesn't mean the strategy of ramping up commercial partnerships is innately flawed, Michael Lembeck, a former NASA official turned associate professor in aerospace engineering at the University of Illinois told AFP.

"It's a balance of making progress versus accepting risk -- and I think in the long term these failures are just as informative success," he said, adding NASA's contracts with other companies, including Houston-based Intuitive Machines, which will attempt to launch a lander next month, helped spread such risks.

- Artemis safety issues -

But, further spoiling the mood for space watchers, NASA Administrator Bill Nelson announced the agency was pushing back its planned return of astronauts to the lunar surface from December 2025 to September 2026, citing safety issues with the Orion crew capsule.

And few analysts believe the new date for American boots on the Moon is credible.

In a briefing Tuesday, NASA officials went into new detail about concerns linked to the Orion capsule built by Lockheed Martin.

First, the uncrewed Artemis 1 mission revealed the heat shield lost some of its material during its fiery reentry to the atmosphere.

Second, a design flaw has been uncovered during new testing in Orion's ability to open and shut valves connected to the life support system -- described by Amit Kshatriya, deputy associate administrator for the Moon to Mars program -- as "unacceptable."

Third, when engineers put the vehicle under stress testing to simulate an emergency ejection from the Space Launch Systems (SLS) rocket, they found a battery became disconnected, meaning Orion might not be able to maintain power as it floats back to the ground.

- SpaceX complications -

While it's back to the drawing board for Orion, its issues are dwarfed by the fact that the Artemis 3 lander, a modified version of SpaceX's next-gen Starship rocket, is nowhere near ready, having exploded in its two orbital test flights to date.

Even once Starship stops blowing up, SpaceX will have to succeed in its own uncrewed lunar landing ahead of Artemis 3.

Its complex plans involve launching a spaceship to serve as a fuel depot, having 10 more Starships launch and fuel up the depot, then having yet another Starship collect that fuel and journey to the Moon, where it would dock with an Orion capsule and fly down to the surface.

Given these constraints, the new deadline is far from realistic, said Lembeck, stressing that compared to the Apollo years, NASA is working to a much tighter budget, in a more risk-averse era, without a national imperative to beat the Soviet Union.

M.Hug--NZN