Zürcher Nachrichten - All systems go for Artemis 1 mission to Moon

EUR -
AED 4.237681
AFN 75.575697
ALL 92.940333
AMD 421.656142
AOA 1058.122213
ARS 1728.956202
AUD 1.633787
AWG 2.077011
AZN 1.945226
BAM 1.955597
BBD 2.323358
BDT 142.405188
BHD 0.434964
BIF 3448.416033
BMD 1.153895
BND 1.477446
BOB 13.698575
BRL 5.892632
BSD 1.15348
BTN 110.034939
BWP 15.57038
BYN 3.419918
BYR 22616.341608
BZD 2.320009
CAD 1.608143
CDF 2619.917771
CHF 0.935353
CLF 0.026801
CLP 1054.82155
CNY 7.786026
CNH 7.783968
COP 3623.980269
CRC 523.056928
CUC 1.153895
CUP 30.578217
CVE 110.253532
CZK 24.246391
DJF 205.418634
DKK 7.475866
DOP 67.263004
DZD 153.32836
EGP 57.978842
ERN 17.308425
ETB 186.588492
FJD 2.551207
FKP 0.853163
GBP 0.854863
GEL 3.011187
GGP 0.853163
GHS 13.571588
GIP 0.853163
GMD 84.816206
GNF 10129.946354
GTQ 8.800085
GYD 241.584872
HKD 9.053789
HNL 30.918784
HRK 7.535739
HTG 150.824312
HUF 364.485455
IDR 20573.947493
ILS 3.461731
IMP 0.853163
INR 110.028559
IQD 1511.142822
IRR 1586288.276314
ISK 142.206313
JEP 0.853163
JMD 182.501018
JOD 0.818185
JPY 183.741653
KES 149.210113
KGS 100.907683
KHR 4673.513894
KMF 491.559225
KRW 1629.997786
KWD 0.356542
KYD 0.9613
KZT 537.975699
LAK 26026.292929
LBP 103298.655603
LKR 385.739878
LRD 208.208344
LSL 18.719353
LTL 3.407152
LVL 0.69798
LYD 7.356235
MAD 10.687188
MDL 20.036916
MGA 4963.483733
MKD 61.513602
MMK 2422.530647
MNT 4148.022534
MOP 9.32273
MRU 46.106204
MUR 54.27904
MVR 17.827624
MWK 2000.191954
MXN 19.759816
MYR 4.72185
MZN 73.739592
NAD 18.719353
NGN 1572.262254
NIO 42.445585
NOK 10.968631
NPR 176.051688
NZD 1.963162
OMR 0.443666
PAB 1.15348
PEN 3.899694
PGK 5.176462
PHP 70.583912
PKR 320.191096
PLN 4.297007
PYG 6868.285609
QAR 4.205063
RON 5.240181
RSD 117.359248
RUB 95.137449
RWF 1699.123269
SAR 4.322325
SBD 9.306967
SCR 15.797863
SDG 692.91888
SEK 10.965822
SGD 1.477245
SLE 28.388939
SOS 659.231431
SRD 43.560114
STD 23883.296381
STN 24.497452
SVC 10.09295
SZL 18.708459
THB 38.202042
TJS 10.629794
TMT 4.050171
TND 3.386948
TRY 55.08686
TTD 7.812357
TWD 37.209663
TZS 3052.632612
UAH 51.756417
UGX 4291.553623
USD 1.153895
UYU 46.445169
UZS 13715.573403
VES 872.07044
VND 30158.776144
VUV 137.137857
WST 3.15444
XAF 655.888779
XAG 0.017687
XAU 0.000263
XCD 3.118459
XCG 2.079029
XDR 0.815327
XOF 655.888779
XPF 119.331742
YER 275.086221
ZAR 18.677174
ZMK 10386.440091
ZMW 21.62875
ZWL 371.553713
  • CMSC

    -0.0200

    21.55

    -0.09%

  • CMSD

    0.0190

    21.709

    +0.09%

  • BCC

    0.8750

    85.625

    +1.02%

  • NGG

    0.4600

    79.94

    +0.58%

  • RIO

    -0.3200

    101.59

    -0.31%

  • RBGPF

    -0.6200

    69.88

    -0.89%

  • RELX

    0.0150

    35.635

    +0.04%

  • BCE

    0.6800

    23.22

    +2.93%

  • RYCEF

    -0.2800

    20.57

    -1.36%

  • VOD

    0.0650

    15.815

    +0.41%

  • JRI

    0.0000

    12.73

    0%

  • GSK

    -0.8550

    51.305

    -1.67%

  • BP

    0.3200

    43.2

    +0.74%

  • BTI

    -0.1200

    56.93

    -0.21%

  • AZN

    -1.5600

    160.35

    -0.97%

All systems go for Artemis 1 mission to Moon
All systems go for Artemis 1 mission to Moon / Photo: Gregg Newton - AFP/File

All systems go for Artemis 1 mission to Moon

Fifty years after the last Apollo mission, the Artemis program is poised to take up the baton of lunar exploration with a test launch on Monday of NASA's most powerful rocket ever.

Text size:

The goal is to return humans to the Moon for the first time since the last Apollo mission in 1972 -- and eventually to Mars.

The 322-foot (98-meter) Space Launch System (SLS) rocket is scheduled to blast off at 8:33 am (1233 GMT) from the Kennedy Space Center (KSC) in Florida.

The mission, more than a decade in the planning, may be uncrewed, but is highly symbolic for NASA, which has been under pressure from China and private rivals such as SpaceX.

Hotels around Cape Canaveral are booked solid with between 100,000 and 200,000 spectators expected to attend the launch.

The massive orange-and-white rocket has been sitting on KSC's Launch Complex 39B for a week.

"Ever since we rolled out to the pad last week, you can feel the excitement, the energy," said Janet Petro, director of KSC. "It's really, really palpable."

The objective of the flight, baptized Artemis 1, is to test the SLS and the Orion crew capsule that sits atop the rocket.

Mannequins equipped with sensors will take the place of crew members, recording acceleration, vibration and radiation levels.

Cameras will capture every moment of the 42-day trip and include a selfie of the spacecraft with the Moon and Earth in the background.

- Splashdown in Pacific -

The Orion capsule will orbit around the Moon, coming within 60 miles (100 kilometers) at its closest approach and then firing its engines to get to a distance 40,000 miles beyond, a record for a spacecraft rated to carry humans.

One of the primary objectives of the mission is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to the Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius).

Orion, its descent slowed by parachutes, will end its voyage with a splashdown off the coast of San Diego in the Pacific.

Monday's liftoff will be at the mercy of the weather, which can be unpredictable in Florida at this time of year, and NASA has built in a two-hour launch window.

If the rocket is unable to take off on Monday, September 2 and 5 have been penciled in as alternative flight dates.

Otherwise, it's all systems go.

NASA gave the green light for the mission on Tuesday after a detailed inspection known as a flight readiness review.

That doesn't mean things can't go wrong with a rocket and a capsule flying for the first time.

- 'Inherent risk' -

"We're doing something that is incredibly difficult to do and does carry inherent risk in it," said Mike Sarafin, the Artemis 1 mission manager.

Because it is an uncrewed flight, Sarafin said the mission will continue in conditions that would not be acceptable for a flight with astronauts.

"If we had a failed solar array deployment we would proceed, and that is something that we wouldn't necessarily do on a crewed flight," he said.

A complete failure would be devastating for a program that is costing $4.1 billion per launch and is already running years behind schedule.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

While the Apollo astronauts who walked on the Moon were exclusively white men, the Artemis program plans to include the first woman and person of color.

And since humans have already visited the Moon, Artemis has its sights set on another lofty goal -- an eventual crewed mission to Mars.

Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.

"I think it's going to inspire even more than Apollo did," Bob Cabana, associate NASA administrator and a former astronaut, said of Artemis. "It's going to be absolutely outstanding."

D.Graf--NZN