Zürcher Nachrichten - NASA postpones rocket launch to Moon after fuel leak

EUR -
AED 4.237681
AFN 75.575697
ALL 92.940333
AMD 421.656142
AOA 1058.122213
ARS 1728.956202
AUD 1.633787
AWG 2.077011
AZN 1.945226
BAM 1.955597
BBD 2.323358
BDT 142.405188
BHD 0.434964
BIF 3448.416033
BMD 1.153895
BND 1.477446
BOB 13.698575
BRL 5.892632
BSD 1.15348
BTN 110.034939
BWP 15.57038
BYN 3.419918
BYR 22616.341608
BZD 2.320009
CAD 1.608143
CDF 2619.917771
CHF 0.935353
CLF 0.026801
CLP 1054.82155
CNY 7.786026
CNH 7.783968
COP 3623.980269
CRC 523.056928
CUC 1.153895
CUP 30.578217
CVE 110.253532
CZK 24.246391
DJF 205.418634
DKK 7.475866
DOP 67.263004
DZD 153.32836
EGP 57.978842
ERN 17.308425
ETB 186.588492
FJD 2.551207
FKP 0.853163
GBP 0.854863
GEL 3.011187
GGP 0.853163
GHS 13.571588
GIP 0.853163
GMD 84.816206
GNF 10129.946354
GTQ 8.800085
GYD 241.584872
HKD 9.053789
HNL 30.918784
HRK 7.535739
HTG 150.824312
HUF 364.485455
IDR 20573.947493
ILS 3.461731
IMP 0.853163
INR 110.028559
IQD 1511.142822
IRR 1586288.276314
ISK 142.206313
JEP 0.853163
JMD 182.501018
JOD 0.818185
JPY 183.741653
KES 149.210113
KGS 100.907683
KHR 4673.513894
KMF 491.559225
KRW 1629.997786
KWD 0.356542
KYD 0.9613
KZT 537.975699
LAK 26026.292929
LBP 103298.655603
LKR 385.739878
LRD 208.208344
LSL 18.719353
LTL 3.407152
LVL 0.69798
LYD 7.356235
MAD 10.687188
MDL 20.036916
MGA 4963.483733
MKD 61.513602
MMK 2422.530647
MNT 4148.022534
MOP 9.32273
MRU 46.106204
MUR 54.27904
MVR 17.827624
MWK 2000.191954
MXN 19.759816
MYR 4.72185
MZN 73.739592
NAD 18.719353
NGN 1572.262254
NIO 42.445585
NOK 10.968631
NPR 176.051688
NZD 1.963162
OMR 0.443666
PAB 1.15348
PEN 3.899694
PGK 5.176462
PHP 70.583912
PKR 320.191096
PLN 4.297007
PYG 6868.285609
QAR 4.205063
RON 5.240181
RSD 117.359248
RUB 95.137449
RWF 1699.123269
SAR 4.322325
SBD 9.306967
SCR 15.797863
SDG 692.91888
SEK 10.965822
SGD 1.477245
SLE 28.388939
SOS 659.231431
SRD 43.560114
STD 23883.296381
STN 24.497452
SVC 10.09295
SZL 18.708459
THB 38.202042
TJS 10.629794
TMT 4.050171
TND 3.386948
TRY 55.08686
TTD 7.812357
TWD 37.209663
TZS 3052.632612
UAH 51.756417
UGX 4291.553623
USD 1.153895
UYU 46.445169
UZS 13715.573403
VES 872.07044
VND 30158.776144
VUV 137.137857
WST 3.15444
XAF 655.888779
XAG 0.017687
XAU 0.000263
XCD 3.118459
XCG 2.079029
XDR 0.815327
XOF 655.888779
XPF 119.331742
YER 275.086221
ZAR 18.677174
ZMK 10386.440091
ZMW 21.62875
ZWL 371.553713
  • BCC

    0.3400

    85.09

    +0.4%

  • NGG

    0.7900

    80.27

    +0.98%

  • CMSC

    -0.0400

    21.53

    -0.19%

  • CMSD

    0.0200

    21.71

    +0.09%

  • RIO

    -0.6800

    101.23

    -0.67%

  • BCE

    0.7450

    23.285

    +3.2%

  • GSK

    -0.8950

    51.265

    -1.75%

  • RBGPF

    -0.6200

    69.88

    -0.89%

  • AZN

    -1.7200

    160.19

    -1.07%

  • RYCEF

    -0.2800

    20.57

    -1.36%

  • VOD

    0.1750

    15.925

    +1.1%

  • JRI

    0.0180

    12.748

    +0.14%

  • RELX

    -0.2150

    35.405

    -0.61%

  • BP

    0.4950

    43.375

    +1.14%

  • BTI

    -0.2800

    56.77

    -0.49%

NASA postpones rocket launch to Moon after fuel leak
NASA postpones rocket launch to Moon after fuel leak / Photo: CHANDAN KHANNA - AFP

NASA postpones rocket launch to Moon after fuel leak

NASA on Saturday scrapped a second attempt to get its new 30-story rocket off the ground and send its uncrewed test capsule toward the Moon after engineers detected a fuel leak.

Text size:

With millions around the globe and hundreds of thousands on nearby beaches waiting for the historic launch of the massive Space Launch System (SLS), a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in.

"The launch director waived off today’s Artemis I launch," NASA said in a statement. "Multiple troubleshooting efforts to address the area of the leak... did not fix the issue."

Though the area around the launch site was closed to the public, an estimated 400,000 people had gathered nearby to see -- and hear -- the most powerful vehicle that NASA has ever launched climb into space.

The initial launch attempt on Monday was also halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

Early Saturday, launch director Charlie Blackwell-Thompson had given the go-ahead to start filling the rocket's tanks with cryogenic fuel.

About three million liters of ultra-cold liquid hydrogen and oxygen were due to be pumped into the spacecraft, but the process soon hit problems.

No new date for another try was immediately announced.

After the latest delay, there are backup opportunities on Monday or Tuesday. After that, the next launch window will not be until September 19, due to the Moon's position.

The purpose of the Artemis 1 mission is to verify that the Orion capsule, which sits atop the SLS rocket, is safe to carry astronauts in the future.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

- Apollo's twin sister -

It will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach. The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A government audit estimates the Artemis program's cost will grow to $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

According to NASA chief Bill Nelson, a crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

F.E.Ackermann--NZN