Zürcher Nachrichten - NASA unsure next Moon rocket launch attempt possible this month

EUR -
AED 4.183233
AFN 72.900796
ALL 91.877285
AMD 414.797448
ANG 2.039348
AOA 1045.665194
ARS 1736.794975
AUD 1.614555
AWG 2.050323
AZN 1.940938
BAM 1.955317
BBD 2.295033
BDT 140.215334
BGN 1.917554
BHD 0.429594
BIF 3432.051477
BMD 1.139068
BND 1.45584
BOB 13.964547
BRL 5.909605
BSD 1.139418
BTN 109.116023
BWP 15.516164
BYN 3.442749
BYR 22325.7403
BZD 2.291733
CAD 1.611725
CDF 2665.420428
CHF 0.943457
CLF 0.027745
CLP 1095.522249
CNY 7.646851
CNH 7.670833
COP 3814.157008
CRC 518.071915
CUC 1.139068
CUP 27.347239
CVE 110.237745
CZK 24.358299
DJF 202.909834
DKK 7.475483
DOP 67.763247
DZD 152.391449
EGP 59.13438
ERN 17.086026
ETB 184.850299
FJD 2.559772
FKP 0.859986
GBP 0.859642
GEL 2.97871
GGP 0.859986
GHS 13.234728
GIP 0.859986
GMD 83.725913
GNF 10021.522331
GTQ 8.701849
GYD 238.411056
HKD 8.934226
HNL 30.583439
HRK 7.533575
HTG 149.123132
HUF 365.202455
IDR 20405.384913
ILS 3.471949
IMP 0.859986
INR 109.142689
IQD 1492.730945
IRR 1565734.922454
ISK 136.984803
JEP 0.859986
JMD 180.27543
JOD 0.807645
JPY 179.158416
KES 147.67349
KGS 99.609484
KHR 4633.85435
KMF 493.217009
KPW 1025.161906
KRW 1543.648431
KWD 0.351563
KYD 0.949565
KZT 504.7852
LAK 25558.681004
LBP 102039.372314
LKR 376.226984
LRD 195.991544
LSL 18.590804
LTL 3.363373
LVL 0.689012
LYD 7.285199
MAD 10.934597
MDL 20.225999
MGA 5030.756222
MKD 61.55978
MMK 2391.810486
MNT 4098.584327
MOP 9.206124
MRU 45.840667
MUR 54.140351
MVR 17.599037
MWK 1975.811511
MXN 20.137822
MYR 4.640683
MZN 72.79829
NAD 18.590804
NGN 1510.837951
NIO 41.929634
NOK 10.830092
NPR 174.585836
NZD 1.992947
OMR 0.439191
PAB 1.139418
PEN 3.868244
PGK 5.076745
PHP 71.01754
PKR 315.746636
PLN 4.37146
PYG 6716.339487
QAR 4.153473
RON 5.27298
RSD 117.420969
RUB 96.076247
RWF 1684.083636
SAR 4.274755
SBD 9.11313
SCR 15.836085
SDG 685.153819
SEK 11.296996
SGD 1.45562
SHP 0.859999
SLE 28.078458
SLL 23885.685201
SOS 651.238991
SRD 42.905863
STD 23576.41575
STN 24.493944
SVC 9.970535
SYP 14810.167401
SZL 18.586405
THB 38.01645
TJS 10.511601
TMT 3.99813
TND 3.373266
TOP 2.742603
TRY 55.748859
TTD 7.750084
TWD 36.141163
TZS 3024.152324
UAH 51.024285
UGX 4462.896617
USD 1.139068
UYU 45.648714
UZS 13485.665874
VES 970.977713
VND 29588.440307
VUV 134.963505
WST 3.127488
XAF 655.957
XAG 0.017716
XAU 0.000265798393
XCD 3.07839
XCG 2.053592
XDR 0.80538
XOF 655.957
XPF 119.331742
YER 269.560946
ZAR 18.57165
ZMK 10252.986409
ZMW 22.227505
ZWL 366.779554
SSP 6507.032816
MXV 2.282055
  • RBGPF

    -0.5900

    65.4

    -0.9%

  • BCC

    1.0400

    77.14

    +1.35%

  • RIO

    0.0900

    94.56

    +0.1%

  • GSK

    -0.4100

    49.24

    -0.83%

  • BCE

    -0.3300

    20.97

    -1.57%

  • RYCEF

    -0.3600

    19.31

    -1.86%

  • CMSC

    -0.1100

    20.4

    -0.54%

  • NGG

    0.2600

    75.49

    +0.34%

  • CMSD

    -0.0700

    20.3

    -0.34%

  • JRI

    -0.1500

    11.02

    -1.36%

  • VOD

    0.1300

    16.62

    +0.78%

  • AZN

    2.0200

    166.58

    +1.21%

  • BTI

    -0.3900

    55.63

    -0.7%

  • RELX

    0.0100

    33.52

    +0.03%

  • BP

    -0.2600

    44.15

    -0.59%

NASA unsure next Moon rocket launch attempt possible this month
NASA unsure next Moon rocket launch attempt possible this month / Photo: CHANDAN KHANNA - AFP

NASA unsure next Moon rocket launch attempt possible this month

After scrapping a second attempt to get its new 30-story lunar rocket off the ground due to a fuel leak, NASA officials said Saturday it may not be possible to try again this month.

Text size:

The current launch window for NASA's Artemis 1 mission to the Moon ends Tuesday and is "definitely off the table," said Jim Free, associate administrator for Exploration Systems Development, at a press conference Saturday.

The next possible launch window is September 19 to October 4, and failing that, October 17 to 31, NASA said.

The ability to take off during those windows "will really depend on the options that the team comes back with likely on Monday or early Tuesday morning," said Free.

Millions around the globe tuned in to live coverage and crowds gathered on beaches in Florida on Saturday hoping to witness the historic blastoff of the Space Launch System (SLS).

But a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in, forcing a halt.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

The first launch attempt on Monday had also been halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

"This is a whole new vehicle, a whole new technology, a whole new purpose of going back to the moon and preparation to go to Mars," said NASA administrator Bill Nelson. "Yes, it's hard."

Artemis mission manager Mike Sarafin described the hydrogen leak as "large," and said one of their "leading suspects" was a seal on a fueling tube.

Engineering teams believe they will have to replace the seal, either directly on the launch pad or after taking the rocket back to its assembly building a few miles away.

It was "too early" to entirely rule out a launch before the end of September, said Sarafin, who promised a status update next week.

NASA has previously said that the early October period would be complicated to coordinate because a crew of astronauts will be using the Kennedy Space Center for a rocket launch to the International Space Station.

In addition to the leak, another problem facing the SLS is its emergency self-destruct system.

Designed to explode in case the rocket deviates off course, the system will likely need to be reexamined before the next launch, which can only be done in the assembly building.

Bringing the rocket in and out of the building will take "several weeks," Sarafin said.

- Apollo's twin sister -

Once launched by SLS, the Orion capsule will take several days to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach.

The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

Mannequins equipped with sensors are standing in for astronauts on the Artemis 1 mission and will record acceleration, vibration and radiation levels.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A successful Artemis 1 mission would come as a huge relief to the US space agency, after years of delays and cost overruns.

The cost of the Artemis program is estimated to reach $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch, according to a government audit.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

A crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

A.Ferraro--NZN