Zürcher Nachrichten - Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

EUR -
AED 4.114832
AFN 72.82921
ALL 91.604903
AMD 405.522397
ANG 2.006002
AOA 1028.567112
ARS 1700.646865
AUD 1.608445
AWG 2.016797
AZN 1.909201
BAM 1.955264
BBD 2.256782
BDT 138.162147
BGN 1.8862
BHD 0.423284
BIF 3352.581483
BMD 1.120443
BND 1.434807
BOB 13.270647
BRL 5.591912
BSD 1.120493
BTN 108.324322
BWP 15.414777
BYN 3.408666
BYR 21960.683364
BZD 2.253583
CAD 1.597981
CDF 2588.223802
CHF 0.929592
CLF 0.027723
CLP 1094.639669
CNY 7.498173
CNH 7.493191
COP 3580.140405
CRC 511.259929
CUC 1.120443
CUP 26.892632
CVE 110.64419
CZK 24.384542
DJF 199.535333
DKK 7.476273
DOP 67.911394
DZD 150.950644
EGP 58.714914
ERN 16.806645
ETB 182.050423
FJD 2.517916
FKP 0.846731
GBP 0.84616
GEL 2.902385
GGP 0.846731
GHS 13.188051
GIP 0.846731
GMD 82.356877
GNF 9857.299366
GTQ 8.565468
GYD 234.331291
HKD 8.793802
HNL 30.07676
HRK 7.535656
HTG 146.7298
HUF 364.995955
IDR 20046.294405
ILS 3.432433
IMP 0.846731
INR 108.431439
IQD 1697.534921
IRR 1993794.756851
ISK 136.862548
JEP 0.846731
JMD 177.841276
JOD 0.794438
JPY 177.349369
KES 145.320186
KGS 97.983173
KHR 4549.75349
KMF 492.995325
KPW 1008.399082
KRW 1501.887083
KWD 0.348413
KYD 0.933744
KZT 509.170501
LAK 25127.115847
LBP 100341.809048
LKR 370.738428
LRD 191.607505
LSL 18.538521
LTL 3.308377
LVL 0.677745
LYD 7.205026
MAD 11.017881
MDL 20.090496
MGA 4996.631058
MKD 61.558135
MMK 2352.721168
MNT 4028.117652
MOP 9.057019
MRU 44.776732
MUR 53.17665
MVR 17.311269
MWK 1942.967679
MXN 20.631954
MYR 4.577574
MZN 71.607937
NAD 18.538521
NGN 1489.06917
NIO 41.238702
NOK 10.713008
NPR 173.318515
NZD 1.998472
OMR 0.431082
PAB 1.120493
PEN 3.842747
PGK 5.080608
PHP 70.302241
PKR 310.28559
PLN 4.388668
PYG 6373.2539
QAR 4.078831
RON 5.340074
RSD 117.34785
RUB 95.416458
RWF 1651.647493
SAR 4.203761
SBD 9.051019
SCR 16.442544
SDG 673.9506
SEK 11.203538
SGD 1.433499
SHP 0.846576
SLE 27.641745
SLL 23495.120995
SOS 640.324568
SRD 42.232303
STD 23190.908531
STN 24.493289
SVC 9.804314
SYP 14568.000545
SZL 18.534922
THB 37.594267
TJS 10.308676
TMT 3.932755
TND 3.371982
TOP 2.697758
TRY 55.149667
TTD 7.611915
TWD 35.810932
TZS 2958.289508
UAH 50.326412
UGX 4581.192898
USD 1.120443
UYU 45.001847
UZS 13334.346748
VES 981.173757
VND 29018.914224
VUV 133.748795
WST 3.121002
XAF 655.957
XAG 0.018422
XAU 0.00026713469
XCD 3.028054
XCG 2.019447
XDR 0.792211
XOF 655.957
XPF 119.331742
YER 264.652664
ZAR 18.509775
ZMK 10085.335807
ZMW 22.269899
ZWL 360.782198
SSP 6450.986431
MXV 2.330891
  • RELX

    0.8900

    36.13

    +2.46%

  • AZN

    0.4200

    159.2

    +0.26%

  • GSK

    -0.0400

    46.5

    -0.09%

  • NGG

    -0.6300

    76.48

    -0.82%

  • RYCEF

    0.4200

    18.47

    +2.27%

  • RIO

    1.4400

    94.78

    +1.52%

  • BTI

    0.0700

    55.5

    +0.13%

  • BP

    -0.1100

    46.25

    -0.24%

  • RBGPF

    0.7800

    66.78

    +1.17%

  • CMSC

    0.0500

    19.95

    +0.25%

  • BCC

    -0.6500

    73.57

    -0.88%

  • VOD

    -0.9200

    15.56

    -5.91%

  • BCE

    -1.1800

    18.78

    -6.28%

  • JRI

    0.1100

    10.62

    +1.04%

  • CMSD

    0.0050

    20.04

    +0.02%

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects
Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

VANCOUVER, BC, AB / ACCESS Newswire / October 15, 2025 / Camino Minerals Corporation (TSXV:COR)(OTCID:CAMZF) ("Camino" or the "Company") is pleased to announce the mobilization of drilling equipment to commence the discovery drilling campaign at its Los Chapitos copper project in Peru ("Los Chapitos" or the "Project"). The 2025 exploration campaign with Camino's partner, Nittetsu Mining Co., Ltd. ("Nittetsu"), resulted in the identification of several prospective drilling targets. The drilling campaign will focus on two main objectives: discovering new copper-silver deposits in newly identified and undrilled targets, such as Mirador, Piloto, Maqui, and Sombrero Blanco, where notable copper occurrences have been found with high copper and silver values ​​according to geochemical results of rocks in trenches, and extending known mineralization in previously drilled Adriana, Lourdes, and Katty (Enjambre) zones.

Text size:

Highlights:

  • The latest results of trenching at the targets to be drilled showed:

    • Mirador: 129m @0.98 % Cu and 20.59 ppm Ag (including: 90m @ 1.07% Cu and 20.98 ppm Ag; 12m @ 2.07% Cu and 60.63 ppm Ag; 26m @ 1.30% Cu and 28.96 ppm Ag)

    • Piloto: 12m @2.3% Cu and 21.13 ppm Ag.

    • Maqui: 7m @4.3% Cu and 25.5 ppm Ag.

    • Enjambre: 18m @1.57% Cu and 11.35 ppm Ag.

    • Adriana: 15m @0.75% Cu and 9.46 ppm Ag.

    • Lourdes: 6m @2.80% Cu and 31.55 ppm Ag.

    • Sombrero Blanco: 25m @0.52% Cu and 3.00 ppm Ag.

  • Copper mineralization is associated with copper oxides and sulfides hosted in intrusive and volcanic rocks.

  • Strong positive correlation between copper and silver mineralization.

  • Drilling is planned to begin the first week of November 2025.

  • Los Chapitos selected by Peru's Ministry of Energy and Mines (MINEM) as one of 15 priority exploration projects.

Los Chapitos is Camino's exploration copper project with partner Nittetsu, which is earning a 35% interest upon completing a total investment of CDN$10 Million (see news release dated June 14, 2023). Rio Tinto, a major copper producer, recently staked claims adjacent to Los Chapitos (see news release dated May 17, 2024). Camino is also advancing its mine development project, the construction-ready Puquios copper project, with Nittetsu in Chile (see news release dated April 17, 2025). 

"Los Chapitos has been recognized by Peru's Ministry of Energy and Minesto advance strategic mineral exploration in 2025 and 2026 to meet the national Perú Explora initiative. Indeed, we are also getting noticed by major mining companies like Rio Tinto that have staked ground adjacent to Los Chapitos", commented Jay Chmelauskas, CEO of Camino. "Our Los Chapitos exploration drilling campaign is set to start in November in Peru, while we get our finance package in place for the construction of our Puquios copper mine in Chile."

"Drilling at Los Chapitos follows intensive geological field work, including geological mapping, sampling of soil and rock, and mechanized trenching at targets located within the Diva and La Estancia trends this year," said Orlando Pariona, lead geologist at Camino Corp. "This has allowed us to identify targets with the greatest potential for extending and/or discovering additional Cu-Ag mineralized bodies."

Figure 1. Occurrence of copper oxides and bornite at the Maqui target.
Figure 2. Drilling campaign target locations.
 

Los Chapitos Drill Campaign
The objective of this drilling campaign is to cut mineralized breccias and copper mantos that have been identified on the surface through detailed mapping and mechanized trenching, to search for continuity and extension at depth and validate the high copper and silver grades observed at surface. The program will commence with approximately 9 drillholes consisting of 1,200 metres and is expected to expand to over 3,000 metres with the next $1.5 million Nittetsu investment tranche anticipated in December 2025.

The drilling targets are located along the Diva and La Estancia trends, where the latest exploration work has demonstrated high-grade copper potential at Los Chapitos (see news releases dated June 17, 2025 and July 16, 2025). The targets in the Diva trend will be Mirador, Adriana, Katty (Piloto, Maqui, and Enjambre), and Lourdes. Sombrero Blanco is along the La Estancia trend and is a high priority target once certain drilling permits are obtained.

This new program builds on the results obtained during the drilling campaigns from 2017 to 2023, which confirmed the presence of high-grade copper mineralization in volcanic rocks of the Chocolate Formation, particularly in the Adriana, Lourdes, and Enjambre sectors. Based on these results, Camino's geological team has developed detailed 3D models of the mineralized system, based on high-resolution structural and lithological mapping.

Los Chapitos is in a strategic location with road access, infrastructure availability, and proximity to the Pacific coast, offering significant logistical advantages for the future development of the project. Excavators and drilling rigs will be mobilized to Los Chapitos during October, 2025 to prepare drilling pads for the start of drilling in November.

The drilling target expressed in this release is conceptual in nature. The target has had insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the exploration target being delineated as a mineral resource.

Los Chapitos Project Update
The Los Chapitos Project has been selected by Peru's Ministry of Energy and Mines ("MINEM") as one of 15 priority exploration projects within the national initiative "Perú Explora: Actions to Drive the Advancement of Strategic Mineral Exploration Projects 2025-2026."

Since July 2025, MINEM has been holding technical working meetings with the companies leading Peru's key exploration projects. The goal of this initiative is to facilitate permitting processes, attract new exploration investment, and strengthen a sustainable portfolio of projects with both regional and national impact.

In September 2025, Camino participated in a work session at the Ministry of Energy and Mines with representatives from the Directorate of Mining Promotion, the Directorate of Environmental Mining Affairs, and the General Directorate of Mining, reaffirming its commitment to advancing responsible and sustainable mineral exploration in Peru.

About Camino
Camino is a discovery and development stage copper exploration company. On October 7, 2024, Camino signed a Definitive Agreement to purchase the construction-ready Puquios copper mine in Chile. Camino is focused on developing copper producing assets such as Puquios, and advancing its IOCG Los Chapitos copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data. Mr. Bassan has verified the data through site visits, inspection of drill core, review of original assay certificates, and confirmation of QA/QC protocols. No limitations were encountered during the verification process, and the data is considered reliable for the purposes of this disclosure.

ON BEHALF OF THE BOARD

For further information, please contact:

/S/ "Jay Chmelauskas"

Camino Investor Relations

President and CEO

[email protected]

Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information within the meaning of applicable securities laws. Forward-looking statements are included to provide information about management's current expectations and plans that allows investors and others to have a better understanding of the Company's business plans and financial performance and condition. All statements, other than statements of historical fact included in this release are forward-looking statements that involve risks and uncertainties. Forward-looking information is typically (though not always) identified by words such as "plan", "expect", "estimate", "intend", "anticipate", "believe", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to a future finance package and construction of Puquios, prospectivity of future exploration work at Los Chapitos, future planned drilling programs, and prospectivity for copper exploration in new targets. Although the Company considers the assumptions underlying such forward-looking information to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those expected by management, that the Company may not realize the benefits of joint ventures and/or strategic partnerships with respect to the Company's properties, that the Company may be unable to obtain or may experience delays in obtaining any required authorizations and approvals and the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp



View the original press release on ACCESS Newswire

A.P.Huber--NZN