Zürcher Nachrichten - Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization

EUR -
AED 4.114832
AFN 72.82921
ALL 91.604903
AMD 405.522397
ANG 2.006002
AOA 1028.567112
ARS 1700.646865
AUD 1.608445
AWG 2.016797
AZN 1.909201
BAM 1.955264
BBD 2.256782
BDT 138.162147
BGN 1.8862
BHD 0.423284
BIF 3352.581483
BMD 1.120443
BND 1.434807
BOB 13.270647
BRL 5.591912
BSD 1.120493
BTN 108.324322
BWP 15.414777
BYN 3.408666
BYR 21960.683364
BZD 2.253583
CAD 1.597981
CDF 2588.223802
CHF 0.929592
CLF 0.027723
CLP 1094.639669
CNY 7.498173
CNH 7.493191
COP 3580.140405
CRC 511.259929
CUC 1.120443
CUP 26.892632
CVE 110.64419
CZK 24.384542
DJF 199.535333
DKK 7.476273
DOP 67.911394
DZD 150.950644
EGP 58.714914
ERN 16.806645
ETB 182.050423
FJD 2.517916
FKP 0.847047
GBP 0.84616
GEL 2.902385
GGP 0.847047
GHS 13.188051
GIP 0.847047
GMD 82.356877
GNF 9857.299366
GTQ 8.565468
GYD 234.331291
HKD 8.793802
HNL 30.07676
HRK 7.535656
HTG 146.7298
HUF 364.995955
IDR 20046.294405
ILS 3.432433
IMP 0.847047
INR 108.431439
IQD 1697.534921
IRR 1993794.756851
ISK 136.862548
JEP 0.847047
JMD 177.841276
JOD 0.794438
JPY 177.349369
KES 145.320186
KGS 97.983173
KHR 4549.75349
KMF 492.995325
KPW 1008.399082
KRW 1501.887083
KWD 0.348413
KYD 0.933744
KZT 509.170501
LAK 25127.115847
LBP 100341.809048
LKR 370.738428
LRD 191.607505
LSL 18.538521
LTL 3.308377
LVL 0.677745
LYD 7.205026
MAD 11.017881
MDL 20.090496
MGA 4996.631058
MKD 61.558135
MMK 2353.045771
MNT 4033.221582
MOP 9.057019
MRU 44.776732
MUR 53.17665
MVR 17.311269
MWK 1942.967679
MXN 20.631954
MYR 4.577574
MZN 71.607937
NAD 18.538521
NGN 1489.06917
NIO 41.238702
NOK 10.713008
NPR 173.318515
NZD 1.998472
OMR 0.431082
PAB 1.120493
PEN 3.842747
PGK 5.080608
PHP 70.302241
PKR 310.28559
PLN 4.388668
PYG 6373.2539
QAR 4.078831
RON 5.340074
RSD 117.34785
RUB 95.416458
RWF 1651.647493
SAR 4.203761
SBD 9.051019
SCR 16.442544
SDG 673.9506
SEK 11.203538
SGD 1.433499
SHP 0.846576
SLE 27.641745
SLL 23495.120995
SOS 640.324568
SRD 42.232303
STD 23190.908531
STN 24.493289
SVC 9.804314
SYP 14568.000545
SZL 18.534922
THB 37.594267
TJS 10.308676
TMT 3.932755
TND 3.371982
TOP 2.697758
TRY 55.149667
TTD 7.611915
TWD 35.810932
TZS 2958.289508
UAH 50.326412
UGX 4581.192898
USD 1.120443
UYU 45.001847
UZS 13334.346748
VES 981.173757
VND 29018.914224
VUV 134.464837
WST 3.121006
XAF 655.957
XAG 0.018422
XAU 0.00026713469
XCD 3.028054
XCG 2.019447
XDR 0.792211
XOF 655.957
XPF 119.331742
YER 264.652664
ZAR 18.509775
ZMK 10085.335807
ZMW 22.269899
ZWL 360.782198
SSP 6450.986431
MXV 2.330891
  • NGG

    -0.6300

    76.48

    -0.82%

  • RIO

    1.4400

    94.78

    +1.52%

  • VOD

    -0.9200

    15.56

    -5.91%

  • AZN

    0.4200

    159.2

    +0.26%

  • RYCEF

    0.4200

    18.47

    +2.27%

  • GSK

    -0.0400

    46.5

    -0.09%

  • BTI

    0.0700

    55.5

    +0.13%

  • RBGPF

    0.7800

    66.78

    +1.17%

  • BCE

    -1.1800

    18.78

    -6.28%

  • CMSC

    0.0500

    19.95

    +0.25%

  • BCC

    -0.6500

    73.57

    -0.88%

  • BP

    -0.1100

    46.25

    -0.24%

  • RELX

    0.8900

    36.13

    +2.46%

  • JRI

    0.1100

    10.62

    +1.04%

  • CMSD

    0.0050

    20.04

    +0.02%

Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization
Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization

Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization

VANCOUVER, BC / ACCESS Newswire / June 10, 2026 / Camino Minerals Corporation (TSXV:COR)(OTCID:CAMZF) ("Camino" or the "Company") is pleased to announce the exploration results from Phase 2 of the recent drilling campaign at its Costa de Cobre project ("Costa de Cobre" or the "Project" (formerly known as "Los Chapitos"(1)) in Peru. Camino completed five drill holes along the Diva trend corridor, where drilling activities focused on the Adriana target with the objective of expanding the known mineralized body and improving the understanding of the scale and continuity of the mineralized system. The maximum drill hole depth was 260 metres and all five drill holes intercepted strong copper mineralization and spanned a strike length of approximately 400 metres.

Text size:

Key highlights of recent Costa de Cobre drill holes:

Adriana: DCH-131:

69.8 m @ 0.47% Cu & 4.17 g/t Ag, including

  • 32.0 m @ 0.75% Cu & 6.50 g/t Ag, and

9.75m @ 1.25% Cu & 6.46 g/t Ag, including

  • 3.90 m @ 2.99% Cu & 15.63 g/t Ag

Adriana DCH-132:

44.0 m @ 0.38% Cu & 1.87 g/t Ag, and

77.6 m @ 0.36% Cu & 1.63 g/t Ag, and

17.6 m @ 2.49% Cu & 12.58 g/t Ag

Adriana: DCH-133:

76.2 m @ 0.88% Cu & 2.03 g/t Ag, including

  • 16.25 m @ 2.67% Cu & 6.82 g/t Ag

Adriana: DCH-134:

53.8 m @ 0.77% Cu & 4.45 g/t Ag, including

  • 40.8 m @ 0.96% Cu & 5.43 g/t Ag

Adriana: DCH-135:

30.6 m @ 0.45% Cu & 2.38 g/t Ag, including

9.3 m @ 0.96% Cu & 6.12 g/t Ag

Costa de Cobre is Camino's second copper project with partner Nittetsu Mining Co, Ltd. ("Nittetsu"), who is completing a 35% earn-in interest in Costa de Cobre after investing CAD $10 million and after the completion of the current drilling campaign (see news release dated June 14, 2023). Camino is also advancing its Puquios Copper Project in Chile with Nittetsu Mining toward mine construction and development (see news release dated April 17, 2025. Construction is expected to commence in the summer, subject to securing project financing and an affirmative final investment decision.

The Costa de Cobre copper project offers growth potential through both resource expansion and new discoveries, supported by established infrastructure, strategic partnerships with Denham Capital and Nittetsu Mining, and exposure to the rapidly growing global copper market.

"These results continue to demonstrate good continuity and grades along the Diva trend at Adriana, with numerous additional high priority targets on the property including along the Diva, La Estancia and Atajo trends. Subject to further exploration of such high priority targets and the delineation of a mineral resource, we envision a copper mine that would be started around an expanded Adriana zone, and possibly connecting to feeder structures at depth, and include additional expanded zones of copper mineralization such as Lourdes located 1.4 km to the north, or Katty located 1 km to the south, and potential copper discoveries along the other La Estancia and Atajo trends. Costa de Cobre is located at low elevation along Peru's southern coast, close to major infrastructure, including the recently announced construction of the San Juan de Marcona port terminal, which will enhance future logistics and development in the region. Camino is now positioned with active growth initiatives in both Peru and Chile. With construction preparations advancing at Puquios and continued exploration programs planned in both Chile and Peru, we believe 2026 will be an active and transformative year for the Company as we build a leading copper development and exploration copper platform," said Jay Chmelauskas, CEO of Camino.

Nittetsu Mining's exploration manager, Yoshikazu Fujimoto stated, "Nittetsu has completed the three year earn-in at Costa de Cobre with these results continuing to demonstrate high-grade copper intercepts. Costa de Cobre hosts many discovery targets, and we have only drilled a fraction of the property's multiple copper trends. We now plan to advance the project to establish our joint venture with Camino, where Nittetsu will maintain a 35% Project interest."

"The integration of geological, structural, and drilling information has enhanced our ability to predict and target copper mineralization across Costa de Cobre. This work has not only contributed to recent drilling success but has also highlighted multiple opportunities to expand the mineralized footprint to unlock the broader district-scale potential of the project (Figure 1)," said Paulo Rodriguez and Jheferson Alcocer, geologists at Camino in Peru.

Geological Discussion

The recently completed 990.70 metres drilling program has increased total drilling at the Costa de Cobre Copper Project to 29,650 metres, further strengthening the Project's growing exploration database. Notably, approximately 91% of all historical drilling has been focused along the highly prospective Diva trend, extending approximately 7 km, underscoring the Company's strategic emphasis on this important copper corridor.

In addition to the Diva trend, other major structural corridors, such as La Estancia and Atajo, extending approximately 18 km and 8 km, respectively, remain significant, underexplored, and present compelling targets for future drilling campaigns.

Drilling in the vicinity of the Diva trend has expanded the mineralized footprint within the Adriana zone, highlighting the growth potential of the mineralized body. Five drill holes were completed along the highly prospective Adriana zone (holes DCH-131, DCH-132, DCH-133, DCH-134, and DCH-135) (Figure 2).

Figure 1. Map Showing the three copper corridors at Costa de Cobre project, Diva, La Estancia and Atajo trends.

Figure 2. Target location and holes drilled in the 2026 drilling campaign.

HOLE ID

EAST

NORTH

AZIMUTH

DIP

DEPTH (M)

FROM

TO

WIDTH (M)

GRADE (% Cu)

GRADE (g/t Ag)

AREA

DCH-131

574129.00

8266853.00

225.00

-50.00

188.80

7.40

20.20

12.80

0.57

6.93

Adriana

and

30.20

100.00

69.80

0.47

4.17

incl

45.50

77.50

32.00

0.75

6.50

and

107.70

127.50

19.80

0.41

2.32

and

132.00

139.50

7.50

0.30

3.09

and

159.45

169.20

9.75

1.25

6.46

incl

161.00

164.90

3.90

2.99

15.63

and

177.50

182.25

4.75

0.12

0.25

DCH-132

574205.00

8266841.00

225.00

-51.00

223.70

7.50

51.50

44.00

0.38

1.87

Adriana

and

64.50

80.00

15.50

0.20

0.98

and

96.50

174.10

77.60

0.36

1.63

and

188.60

207.30

18.70

2.35

11.85

incl

189.70

207.30

17.60

2.49

12.58

DCH-133

574317.50

8266664.00

225.00

-62.00

169.10

19.70

24.65

4.95

0.28

2.12

Adriana

and

89.50

165.70

76.20

0.88

2.03

incl

139.75

156.00

16.25

2.67

6.82

DCH-134

574386.00

8266570.00

217.00

-51.00

117.20

0.50

54.30

53.80

0.77

4.45

Adriana

incl

6.00

46.80

40.80

0.96

5.43

DCH-135

574129.00

8266853.00

225.00

-77.00

291.90

8.70

27.70

19.00

0.40

4.72

Adriana

incl

11.50

18.70

7.20

0.79

9.33

and

54.10

84.70

30.60

0.45

2.38

incl

66.50

75.80

9.30

0.96

6.12

and

90.45

96.00

5.55

0.38

0.79

and

109.50

118.50

9.00

0.40

2.26

and

138.90

141.00

2.10

0.83

1.55

and

151.50

157.40

5.90

0.32

1.05

and

185.95

189.00

3.05

0.27

0.57

and

251.30

267.60

16.30

0.30

0.44

incl

254.10

260.10

6.00

0.46

0.42

Notes: Datum for coordinates is WGS84 Zone 18S. Widths are not true widths

Table 1. Summary of the 2026-1 drilling campaign, Costa de Cobre Copper Project, Peru.

The project area within the Adriana zone is underlain by volcanic rocks of the Chocolate Formation, with pseudo-bedding displaying a strike of N250°-270° and a dip of 12°-30° to the NW. Up to three volcanic units have been identified, consisting of epiclastic sandstones, andesitic lavas, and lapilli tuffs, which are intruded by fine-grained monzodioritic hypabyssal bodies.

Mineralization is structurally controlled by the NW-SE-trending Diva fault, which traverses the drilled area and segments it into the East and West block domains. Copper mineralization is primarily hosted within the volcanic and hypabyssal rocks as breccias and mantos related to this structure. Near the surface, copper oxides are preferentially concentrated within the breccia matrix, partially penetrating the clasts along fractures and microfractures, whereas deeper zones are dominated by sulfides, specifically chalcopyrite and bornite.

Adriana Target

At the Adriana target, recent drilling has intersected significant copper and silver mineralization across multiple intervals. Drill hole DCH-131 returned several mineralized zones, highlighted by an upper intercept of 12.8 m @ 0.57% Cu & 6.93 g/t Ag, a broad zone of 69.8 m @ 0.47% Cu & 4.17 g/t Ag, and a high-grade deeper intercept of 3.90 m @ 2.99% Cu & 15.63 g/t Ag near the bottom of the hole. The system remains open at depth, indicating potential for further mineralization (Figure 3).

Drill hole DCH-132 also intersected substantial continuous mineralization, including a broad shallow interval of 44.0 m @ 0.38% Cu & 1.87 g/t Ag, another thick zone of 77.6 m @ 0.36% Cu & 1.63 g/t Ag, and a deeper high-grade intercept of 17.6 m @ 2.49% Cu & 12.58 g/t Ag (Figure 4).

Additionally, drill hole DCH-133 intercepted an upper interval of 4.95 m @ 0.28% Cu & 2.12 g/t Ag followed by a significant continuous zone of 76.2 m @ 0.88% Cu & 2.03 g/t Ag (Figure 5), while DCH-134 successfully encountered 53.8 m @ 0.77% Cu & 4.45 g/t Ag starting nearly from the surface (0.5 m) (Figure 6).

Notably, assay results for drill hole DCH-135 confirmed multiple stacked mineralized horizons throughout the entire hole, highlighted by an upper zone of 19 m @ 0.40% Cu & 4.72 g/t Ag, an intermediate interval of 9 m @ 0.40% Cu & 2.26 g/t Ag, and a deeper zone of 16.3 m @ 0.30% Cu & 0.44 g/t Ag. These recent intercepts continue to support the continuity of mineralization and indicate the potential for additional high-grade zones within the Adriana zone.

Figure 3. Cross section of copper mineralization at Adriana zone, drill holes DCH-131 and DCH-135.

Figure 4. Cross section of copper mineralization at Adriana zone, drill hole DCH-132.

Figure 5. Cross section of copper mineralization at Adriana zone, drill hole DCH-133.

Figure 6. Cross section of copper mineralization at Adriana zone, drill hole DCH-134.

The Costa de Cobre exploration and development program is designed to systematically unlock the value of a district-scale copper-silver system through resource expansion, new discoveries, and progressive de-risking of the asset.

Recent drilling supports the Company's geological model, indicating continuity of mineralization along the Diva Trend and suggesting that the system remains open both at depth and along strike. The next phases of exploration are focused on expanding known mineralized zones, testing multiple high-priority targets across the underexplored Diva, La Estancia, and Atajo structural corridors, and advancing the project toward resource delineation and future development milestones, with only a small portion of the prospective district and three copper corridors across the property systematically drill-tested to date.

Sampling and Assay Procedures

During this campaign, five drillholes were completed. Core has been logged and sampled at the Company's facilities in the town of Chala, 15 km from the project. Industry standard chain of custody and QA/QC practices are followed with samples sent to Lima where they are analyzed by ICP-MS at ALS Chemex Labs' facility, an independent laboratory. The Camino geological team complied with the written internal QA/QC procedures, where the insertion of blank samples, certified international standards (pulps) and duplicates, met the objectives and acceptable results.

(1)All previously disclosed technical and scientific information in respect of the Los Chapitos copper project remains applicable to the Costa de Cobre Project.

About Camino

Camino is a discovery and development stage copper exploration company. The Company has entered into a joint venture partnership with Nittetsu Mining Co., Ltd. to advance the construction-ready Puquios copper project in Chile toward development and production. Camino is advancing its IOCG Costa de Cobre copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data, with such verification including a review of assay certificates, QA/QC results, and drill logs.

ON BEHALF OF THE BOARD

For further information, please contact:

/S/ "Jay Chmelauskas"

Camino Investor Relations

President and CEO

[email protected]

Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to the prospectivity of future exploration work at Costa de Cobre, future planned drilling programs in Peru and Chile, the interpretation of geological models, the potential continuity and extent of mineralized systems, the continuation of drilling with future campaigns, and the prospectivity for copper exploration in new targets. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those anticipated by management; that geological interpretations, including the continuity or extent of mineralized bodies, may change with additional drilling; that the Company may not realize the benefits of joint ventures and/or strategic partnerships; that the Company may be unable to obtain or may experience delays in obtaining required permits, authorizations and approvals; operational and technical risks inherent in exploration; risks related to third‑party infrastructure development and timing, including the proposed San Juan de Marcona Port; and risks related to the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp



View the original press release on ACCESS Newswire

W.Vogt--NZN