Zürcher Nachrichten - Camino Announces Exploration Results at Los Chapitos and Further Exploration Plans in Peru

EUR -
AED 4.114832
AFN 72.82921
ALL 91.604903
AMD 406.788551
ANG 2.006002
AOA 1028.567112
ARS 1699.432415
AUD 1.608445
AWG 2.016797
AZN 1.909201
BAM 1.955264
BBD 2.256782
BDT 138.162147
BGN 1.8862
BHD 0.423284
BIF 3352.581483
BMD 1.120443
BND 1.434807
BOB 13.272364
BRL 5.591912
BSD 1.120493
BTN 108.324322
BWP 15.414777
BYN 3.408666
BYR 21960.683364
BZD 2.253583
CAD 1.599937
CDF 2588.223802
CHF 0.929592
CLF 0.027723
CLP 1094.639669
CNY 7.498173
CNH 7.493191
COP 3601.113392
CRC 511.259929
CUC 1.120443
CUP 26.892632
CVE 110.234799
CZK 24.384542
DJF 199.535333
DKK 7.476273
DOP 67.911394
DZD 150.950644
EGP 58.678924
ERN 16.806645
ETB 182.050423
FJD 2.517916
FKP 0.846731
GBP 0.84616
GEL 2.902385
GGP 0.846731
GHS 13.171391
GIP 0.846731
GMD 82.356877
GNF 9857.299366
GTQ 8.566653
GYD 234.36579
HKD 8.793353
HNL 30.07676
HRK 7.535656
HTG 146.7298
HUF 364.995955
IDR 20046.294405
ILS 3.432433
IMP 0.846731
INR 108.431439
IQD 1697.534921
IRR 1993794.756851
ISK 136.862548
JEP 0.846731
JMD 177.841276
JOD 0.794438
JPY 177.62948
KES 145.320186
KGS 97.983173
KHR 4549.75349
KMF 492.995325
KPW 1008.399082
KRW 1502.380078
KWD 0.348413
KYD 0.933744
KZT 509.170501
LAK 25127.115847
LBP 100341.809048
LKR 370.738428
LRD 191.607505
LSL 18.538521
LTL 3.308377
LVL 0.677745
LYD 7.205026
MAD 11.002985
MDL 20.090496
MGA 4996.631058
MKD 61.558135
MMK 2352.721168
MNT 4028.117652
MOP 9.057019
MRU 44.776732
MUR 53.17665
MVR 17.311269
MWK 1942.967679
MXN 20.418997
MYR 4.577574
MZN 71.607937
NAD 18.538521
NGN 1489.06917
NIO 41.238702
NOK 10.713008
NPR 173.318515
NZD 1.998472
OMR 0.431082
PAB 1.120493
PEN 3.842747
PGK 5.080608
PHP 70.302241
PKR 310.28559
PLN 4.388668
PYG 6373.2539
QAR 4.095578
RON 5.340074
RSD 117.34785
RUB 95.393865
RWF 1651.647493
SAR 4.209247
SBD 9.051019
SCR 16.442544
SDG 673.9506
SEK 11.203538
SGD 1.427337
SHP 0.846576
SLE 27.641745
SLL 23495.120995
SOS 640.324568
SRD 42.232303
STD 23190.908531
STN 24.493289
SVC 9.804314
SYP 14568.000545
SZL 18.534922
THB 37.594267
TJS 10.308676
TMT 3.932755
TND 3.344084
TOP 2.697758
TRY 55.149667
TTD 7.611915
TWD 35.810932
TZS 2958.289508
UAH 50.326412
UGX 4581.744725
USD 1.120443
UYU 45.007669
UZS 13334.346748
VES 981.173757
VND 29018.914224
VUV 133.748795
WST 3.121002
XAF 655.957
XAG 0.018422
XAU 0.00026713469
XCD 3.028054
XCG 2.019447
XDR 0.792211
XOF 655.957
XPF 119.331742
YER 264.652664
ZAR 18.532534
ZMK 10085.335807
ZMW 22.269899
ZWL 360.782198
SSP 6450.986431
MXV 2.306828
  • VOD

    -0.9200

    15.56

    -5.91%

  • NGG

    -0.6300

    76.48

    -0.82%

  • RELX

    0.8900

    36.13

    +2.46%

  • AZN

    0.4200

    159.2

    +0.26%

  • RIO

    1.4400

    94.78

    +1.52%

  • GSK

    -0.0400

    46.5

    -0.09%

  • RBGPF

    0.7800

    66.78

    +1.17%

  • CMSC

    0.0500

    19.95

    +0.25%

  • RYCEF

    0.4200

    18.47

    +2.27%

  • BCE

    -1.1800

    18.78

    -6.28%

  • BCC

    -0.6500

    73.57

    -0.88%

  • BTI

    0.0700

    55.5

    +0.13%

  • BP

    -0.1100

    46.25

    -0.24%

  • JRI

    0.1100

    10.62

    +1.04%

  • CMSD

    0.0050

    20.04

    +0.02%

Camino Announces Exploration Results at Los Chapitos and Further Exploration Plans in Peru
Camino Announces Exploration Results at Los Chapitos and Further Exploration Plans in Peru

Camino Announces Exploration Results at Los Chapitos and Further Exploration Plans in Peru

VANCOUVER, BC / ACCESS Newswire / May 6, 2025 / Camino Minerals Corporation (TSXV:COR)(OTC PINK:CAMZF) (WKN: A116E1) ("Camino" or the "Company") is pleased to announce exploration results at its Copper-Silver stratabound Los Chapitos copper project ("Los Chapitos" or the "Project"), including drilling and additional mapping, trenching, and sampling along both the La Estancia and Diva copper mineralized trends. The Company is targeting large-scale disseminated manto-type copper-silver mineralization to support resource delineation studies at Los Chapitos. Camino and its partner Nittetsu Mining Co., Ltd. ("Nittetsu") plan to commence the next phase of drilling in the second half of 2025. The Los Chapitos copper project is located near the coastal city of Chala in the department of Arequipa in Peru.

Text size:

Juan Carlos Castelli, Consulting Geologist from Chile, said "the Los Chapitos property is inside the northern continuation of the metallogenic Cu-Ag belt defined in Northern Chile, with operating mines such as Michilla, Las Luces, and others. We are working with Camino and Nittetsu on an aggressive exploration program, led by geological mapping and sections interpretations, geochemistry and magnetometry focused to drill the best target areas to increase the known resources in order to make a new economic copper discovery", (Figure 1).

Yoshikazu Fujimoto, Senior Geologist at Nittetsu, stated that "the geological work that we are completing at Los Chapitos is an effort to focus our exploration taskforce on bulk mineralized targets and to screen a very large land position of over 220 square kilometers that has many copper-mineralized showings."

"To make new copper discoveries, we've got to step out and continue to drill untested prospects. The geology at Los Chapitos indicates tremendous prospectivity and notably, Rio Tinto has staked ground adjacent to our claims, so we've got to put the drill where the bulk copper potential exists and keep drilling. We plan to continue drilling in the second half of 2025 at new discovery targets" said Jay Chmelauskas, CEO of Camino. "Camino is pursuing two value creation fronts, developing our permitted Puquios copper mine in Chile, and continuing to exploration drill for new copper discoveries in Peru in 2025," Mr. Chmelauskas added.

The greenfield drilling campaign of 996.7m at the Pampero prospect increases the meters drilled at Los Chapitos to a total of 27,624 m. 94% of the historic drilling meters have been drilled along the Diva Trend, with significant copper intercepts at Adriana, Lourdes, and Diana prospects. After increasing the EIA permitted areas at the Project, Camino is now beginning to drill test new prospective areas, particularly along the La Estancia fault for new copper discoveries (Figure 1 and Figure 2).

Highlights:

  • The drilling campaign has validated the Pampero prospect as a Cu-Ag mineral system to support more exploration along the Estancia thick skin fault for economic copper intercepts.

  • Copper oxides mineralized in the Pampero area have shown continuity at depth with geochemical results at drill hole DCH-118 with copper grades up to 0.5%, silver 3.15 ppm at a depth of 157.6 m following the main structural control.

  • Surface rock chip sampling over 500m at Pampero show geochemical anomalies of copper, with grades up to 3.8% and 4.0 ppm silver, as black and green copper oxides (chrysocolla, tenorite).

  • The geology at Pamperoexhibits chlorite-smectite alteration bands linked to copper mineralization increasing the opportunity for discoveries at Sombrero Blanco, the Company's next prospect to the southeast along the La Estancia Fault.

  • More exploration work has been undertaken along the established Diva Trend to generate step-out drilling targets at prospects such as Katty, Diana, and Lourdes that have demonstrated significant copper intercepts in previous drilling campaigns.

Figure 1. Locations of main copper exploration trend and targets.

Camino's recent drilling campaign strategy has targeted prospects along the untested copper trend of the La Estancia fault that spans over 12 kilometers in NW-SE direction, parallel to the Diva Trend. New exploration targets at Sombrero Blanco along the La Estancia Fault were geochemically sampled and geologically mapped as potential next drilling targets, while historic exploration targets like Katty, Diana, and Lourdes within the Diva Trend were geologically reinterpreted and resampled to potentially expand the known copper zones. The Company also plans to continue drilling campaigns and surface mapping along the Diva, La Estancia and Atajo Trends to expand known mineralized zones with many prospective targets (Figure 2).

Figure 2. Los Chapitos project portfolio.

Greenfield drillholes at Pampero were located more than 10 km to the north-west from the known copper mineralization in the Adriana copper zone (Figure 1). The program was designed to test buried copper stratabound mantos located near the copper-controlling structures like the Diva Fault Trend. In this first drilling phase at the La Estancia Fault, a total of 10 drillholes were completed to depths from 38 meters to a maximum of 200.4 meters for a total of 996.7 meters drilled (Figure 3). Drilling results are summarized in Table 1.

At Pampero, alteration and mineralization are controlled by the La Estancia fault and secondary north west and north south trending faults. This set of structures acted as feeders, while the volcanic rocks of the Chocolate Formation acted as receptors. Camino has been prioritizing their exploration in this volcanic sequence, which has the potential to host large-tonnage copper deposits. The program successfully identified or extended oxide copper mineralization northwest of the La Estancia fault, along the Pampero area (Figure 1).

Figure 3. Geology and drillholes at the Pampero prospect

Between December 2024 and March 2025, rock chips were sampled at Katty and Sombrero Blanco in sub-outcrops and outcrops along handmade trenches (sampling between 1m to 2m).

At Sombrero Blanco, 205 samples were taken with 78% of their total copper grades higher than 0.1% Cu (copper) and maximum grades of 0.06ppm Au (gold) and 12.0ppm Ag (silver), the chip sample V717989 over 1 m of sampling reached grades of up to 2.75% Cu and 0.42 ppm Ag in copper oxides like malachite, chrysocolla, and copper wad (Photo 1 and Figure 4).

At Katty, 25 samples were taken with 100% of their total copper grades higher than 0.3% Cu and maximum grades of 0.1ppm Au and 26.8ppm Ag, the chip sample V713818 over 2m of sampling reached grade up to 2.86% Cu and 26.2 ppm Ag in copper oxides like malachite, chrysocolla, and copper wad (Photo 2).

Photo 1. Left: Camino team sampling at Sombrero Blanco. Right: close-up of the mineralization in the trenches, green copper oxides (brochantite-malachite).

Photo 2. Left: Camino team sampling outcrops at Katty. Right: close-up of the sampling site, occurrence of green copper oxides (malachite-chrysocolla).

Figure 4. Geology and geochemistry of North Sombrero Blanco

Table 1. Summary of Drill Results March 2025, Los Chapitos Copper Project, Peru

HOLE ID

EASTING (GPS..)

NORTHING (GPS..)

AZIMUTH

DIP

LENGTH (M)

FROM

TO

WIDTH (M)

GRADE (% Cu)

GRADE (ppm Ag)

AREA

DCH-113

563776

8270443

210

-46

150.0

91.0

92.5

1.5

0.14

0.87

Pampero Norte

DCH-114

563775

8270443

270

-60

90.0

Traces Copper no more than 839 ppm and Ag 1.09 ppm

Pampero Norte

DCH-115

563716

8270464

90

-60

100.0

15.3

15.9

0.6

0.11

0.19

Pampero Norte

31.6

34.4

2.8

0.24

1.38

42.5

43.7

1.2

0.40

0.99

83.8

84.6

0.8

0.11

0.23

DCH-116

563782

8270461

270

-70

81.0

Traces Copper no more than 652 ppm, Ag 3.75 ppm and Au 0.082 ppm

Pampero Norte

DCH-117

563697

8270384

90

-60

105.0

38.2

39.9

1.7

0.13

0.62

Pampero Norte

50.0

51.4

1.4

0.13

0.24

DCH-118

563815

8270321

315

-45

200.4

50.8

52.2

1.5

0.12

0.11

Pampero Norte

157.6

158.1

0.5

0.50

3.15

164.4

166.7

2.3

0.27

0.85

169.7

171.2

1.5

0.33

0.32

DCH-119

563823

8270259

180

-55

85.5

Traces Copper no more than 575 ppm and Ag 0.94 ppm

Pampero Sur

DCH-120

563935

8270208

165

-50

65.0

37.8

39.5

1.8

0.11

0.34

Pampero Sur

DCH-121

563983

8270156

242

-60

81.8

14.6

16.0

1.4

0.13

0.24

Pampero Sur

78.8

81.8

3.1

0.26

0.53

DCH-122

563784

8270459

90

-50

38.0

Traces Copper no more than 939 ppm and Ag 0.53 ppm

Pampero Sur

Final coordinates (East-North-Elevation, metric) taken at the end of the drillhole using GPS model (GPS MAP 64) and measurement of the drill hole trajectory with DeviGyro RG40 STANDARD tool every 5m according to protocol.

The potential quantity and grade of the exploration target expressed in this release is conceptual in nature. The target is not necessarily indicative of mineralization on the property and there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the exploration target being delineated as a mineral resource.

Sampling and Assay Procedures

During this campaign, 10 drillholes and 230 chip samples were completed. Core has been logged and sampled at the Company's facilities in the town of Chala, 15 km from the project. Industry standard chain of custody and QA/QC practices are followed with samples sent to Lima where they are analyzed by ICP-MS at ALS Chemex Labs' facility. The Camino geological team complied with the written internal QA/QC procedures, where the insertion of blank samples, certified international standards (pulps) and duplicates, met the objectives and acceptable results.

About Camino

Camino is a discovery and development stage copper exploration company. Camino is focused on developing copper producing assets such as Puquios, a construction-ready copper mine in Chile, and advancing its IOCG Los Chapitos copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI 43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, FAusIMM (CP) 227922, MSc. Geologist, an independent geologist and a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure.

ON BEHALF OF THE BOARD

/S/ "Jay Chmelauskas"
President and CEO

For further information, please contact:
Camino Investor Relations
[email protected]
Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes the prospectivity of future exploration work at Los Chapitos, future planned drilling programs, prospectivity for copper exploration in new targets; expectations for joint ventures and/or strategic partnerships with respect to the Company's properties and the receipt of necessary authorizations and approvals. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those expected by management, that the Company may not realize the benefits of joint ventures and/or strategic partnerships with respect to the Company's properties, that the Company may be unable to obtain or may experience delays in obtaining any required authorizations and approvals and the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp.



View the original press release on ACCESS Newswire

A.Wyss--NZN